Laserfiche WebLink
Proposal for Consultant Services <br />Pleasanton Aquatic Center Renovation Phase III <br />Page 12 of 12 <br />9.0 AUTHORIZED SIGNATURES <br />9.1 This proposal is valid for thirty (30) calendar days from the date <br />referenced below and is submitted for and in behalf of <br />CONSULTANT by: <br />AQUATIC DESIGN GROUP, INC. <br />By: Dennis R. Berkshire <br />Its: Director of Client Services <br />By: Scott J. Ferrell, AIA <br />Its: Vice-President <br />_23_February2009 __ <br />Date <br />