My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
040709
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2009 4:38:42 PM
Creation date
4/1/2009 4:36:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/7/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Consultant Services <br />Pleasanton Aquatic Center Renovation Phase III <br />Page 11 of 12 <br />8.1 CONSULTANT shall prosecute design work in conformance with the <br />following schedule, contingent upon receipt of all required <br />information (program, base sheets, soils data, etc.) from CLIENT or <br />CLIENT'S designated representative: <br />8.1.1 Schematic Design Phase: Complete within sixty (60J <br />calendar days of CONSULTANT'S receipt of fully executed <br />professional services agreement between CLIENT and <br />CONSULTANT. <br />8.1.2 Design Development Phase: Complete within sixty (60) <br />calendar days of approval of Schematic Design Documents <br />and authorization to proceed with Design Development <br />Phase. <br />8.1.3 Construction Documents Phase: Complete within sixty (60) <br />calendar days of approval of Design Development <br />Documents and authorization to proceed with Construction <br />Documents Phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.