BACKGROUND <br />The City's Capital Improvement Program (CIP) includes two projects, Foothill Road <br />Widening (CIP No. 995019) and Foothill Road Storm Drain Improvements (CIP No. <br />985013), funded to address improvements on Foothill Road between Bernal Avenue <br />and Dorothea Court. The projects were designed to include roadway reconstruction to <br />address the advanced state of deterioration of the roadway surface, the lack of concrete <br />curb, gutters and storm drain facilities (which was contributing to minor flooding), and <br />the lack of pedestrian sidewalks which was placing pedestrians on Foothill Road close <br />to vehicular traffic. To improve project efficiencies and minimize costs, the two projects <br />were combined into one construction project. In addition, City CIP funding was <br />supplemented with $308,000 in Proposition 1 B funding which resulted in a total project <br />budget of $591,400. <br />On September 16, 2008, Pleasanton's City Council awarded the contract for the project <br />to DSS Company in the amount of $376,792. The City Council also authorized the <br />Director of Public Works to approve change orders up to the amount of $56,519. The <br />project is now complete and provides minor street widening which resulted in two 12' <br />travel lanes, two 5' bicycle lanes, installation of a pedestrian sidewalk (on the east side <br />of Foothill Road), minor storm drain improvements, a 60' retaining wall necessary to <br />provide support for the sidewalk and roadway, and an asphalt concrete overlay. <br />DISCUSSION <br />During construction, the contractor encountered wet soil conditions while drilling for the <br />retaining wall concrete piers which required a redesign for this work. This resulted in a <br />modified scope of work and caused delays in constructing the retaining wall. This <br />unforeseen condition resulted in exceeding the approved project amount by $30,636. <br />Staff recommends using funds already in the project budget to cover the additional <br />expense of the construction change order and construction support services that is <br />beyond the originally approved contingency amount. Even with these project changes, <br />there is a balance of $94,386 in the project budget that will be transferred to the General <br />Fund and CIP. <br />Submitted by: <br />;~ , <br />~; <br />~ ~~/~~ <br />Brian Dolan <br />Director of <br />Community Development <br />Fiscal Review: Approve by: <br />'~~ ~ ~ <br />~~~~~ ~y~ ~ ~~,u ~ ~ i <br />David P. Culver Nelson Fialho <br />Director of Finance City Manager <br />Attachments: <br />1. Vicinity Map <br />2. Funding and Expenditure Summary <br />Page 2 of 2 <br />