t r t n s v~ n i u i i u x s
<br />system based on inputs such as geographical location, arras orientation, arras tilt, and selection and
<br />yu~mii~c of pV' unnponeuls (modules and im~cri er~.
<br />"fable -4 and ~ also provide esrimnres of cleenicin- generation during the pe;d: demand period. phis can
<br />be the most ~~aluable component of PV' scsrem generation Fur facilities that arc un a rime of use rate
<br />schedule like nc~ OSC site since the PV' geucratiou olttiets clectcicih us'c during the a>stlicsi period.'
<br />Table 5: OSC Electricity Generation
<br />
<br />
<br />Januar
<br />
<br />4,988 •
<br />•
<br />-
<br />
<br />•3,540
<br />~
<br />•1,448
<br />Februar 6,520 - 4,621 1,898
<br />March 9,362 - 6,772 2,589
<br />A ril 12,068 - 7,687 4,381
<br />Ma 14,444 5,830 4,256 4,357
<br />June 14,698 5,818 4,273 4,607
<br />Jul 15,951 5,880 4,292 5,779
<br />Au ust 13,909 5,752 4,124 4,033
<br />Se tember 11,586 4,617 3,293 3,676
<br />October 8,561 3,507 2,540 2,514
<br />November 5,309 - 3,893 1,416
<br />December 4,410 - 2,987 1,423
<br />TOTAL 121,806 31,404 52,280 38,122
<br />Table 6: Well No. 8 Electricity Generation
<br />
<br />
<br />
<br />anuar
<br />
<br />
<br />15,347 •
<br />
<br />
<br />-
<br />-
<br />
<br />10,892
<br />• -
<br />..
<br />4,456
<br />Februar 20,056 - 14,217 5,840
<br />March 28,803 - 20,836 7,967
<br />A ril 37,130 - 23,649 13,480
<br />Ma 44,440 17,938 13,096 13,406
<br />June 45,220 17,899 13,148 14,174
<br />Jul 49, 075 18, 090 13,204 17, 781
<br />_ August 42,798 17,699 12,691 12,409
<br />Se tember 35,647 _ 14,207
<br />-- 10,131 11,309
<br />October _ 26,339 10,788 _ 7,816 7,735
<br />November 16,336 - 11,980 4,356
<br />_ December 13,567 - 9,190 4,376
<br />TOTAL 374,757 96,620 160,849 117,289
<br />Ceetem prtaluaiun do deal= in corpora rts tins nF ,~eneci~iun e,m>idrrs,iiun r, hmeJ in~.i mule .irnirom vealuaiiun nrihi~ na
<br />metering hrne Gis I~um a I'V >~ann .inrr rlrri ri, u, <u<is c.in JepenJin~ nn the time of a=e.
<br />
|