My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
040709
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2009 12:12:42 PM
Creation date
4/1/2009 12:12:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/7/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
meet future environmental programs, staff anticipates this fee increasing with future rate <br />adjustments. <br />In addition the fee adjustment for the existing services, the Subcommittee requested <br />PGS implement a new expanded residential and commercial recycling program to <br />replace the existing programs. The new programs are required to increase the overall <br />amount of material that is made available for recycling to meet the City and county-wide <br />diversion target of 75% in 2010. Currently, approximately 54% of refuse collected in <br />Pleasanton is diverted from landfills to recycling and meeting the 75% diversion target <br />with existing services is unlikely. The new curbside residential program includes an <br />additional container ("cart") to allow for the separation of refuse and recyclables by the <br />property/home owner. To facilitate this enhancement, the MRF will be converted to <br />handle the separation of recyclable material. Currently, the MRF is designed to extract <br />recyclables from refuse. With the new program, material in the refuse cart will be taken <br />directly to the landfill without sorting. Material in the recycle cart will be processed on <br />the MRF. This program will be implemented by the end of 2009. The fee increase <br />attributed to the residential curbside service is 9.29%. However, as discussed later, <br />residents have an opportunity to select a downsized refuse cart which results in a new <br />program increase of 1.58% and an overall increase of 3.9%. <br />The commercial program will be voluntary and is expected to include the collection of <br />recyclables in a cart(s) at commercial buildings in a manner similar to the existing <br />"paper gobbler" program. The primary difference is that the business owner will be <br />required to place the carts outside and recyclable material will include paper, glass, <br />aluminum, etc. This program is expected to be implemented in March 2010. The fee <br />increase attributed to this specific commercial service is 2.50% for commercial <br />accounts. The Table below summarizes the rate adjustment discussed below. A <br />detailed summary of the adjustments is included as Attachment 2. <br />SUMMARY OF REFUSE COLLECTION AND RECYCLING MONTHLY ADJUSTMENT <br /> Residential Commercial <br />Source of Adjustment 96-Gallon Serv. 35-Gallon Serv. Per Cubic Yard <br />Existin Services __ $3.64 13% $3.27 13% $2.94.71 %) <br />PGS Franchise Fee $.29 1 % ___ $.26 1 % $.20 1 <br />New Recycling Services $2.60 9.29% $.40 1.58 $2.964.97%) <br />Total Monthly Adjustment $6.53 (23.29%) $3.93 (15.58%) $6.07 (30.68%); <br />I. Service Rate Adjustments for Existing Services <br />The Franchise outlines the allowable expenses and revenue for services and sets forth <br />a process for reviewing these costs. Essentially, the franchise is based on the balancing <br />account franchise model used regularly in the 1980's that requires the franchisee to <br />estimate cost and revenues for future years and identify any revenue shortfalls from <br />previous years to determine a rate that addresses both of these elements. If revenue <br />projections are less then projected and/or if costs exceeded the amounts projected, the <br />franchisee will incur a "deficit" that the City is obligated to review. As a result, any rate <br />increase includes an estimate of future costs plus a reimbursement to address past <br />Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.