Laserfiche WebLink
• Summary of ramp conditions <br />• Summary of sidewalk and ramp repair costs <br />• Recommended plan of action <br />• Appendices with sidewalk and ramp assessments <br />Deliverables: Draft Executive Summary Report for City Review <br />Subtask D.4: Prepare Final Report <br />It is expected that the City will have comments on the draft report and minor changes will be <br />required prior to final publication. Upon receipt of the City's comments, the draft report will be <br />revised and a final draft will be prepared. <br />Deliverables: Final Report <br />Items to be provided by the City of Pleasanton: <br />• City GIS Data Base <br />• Citywide Aerial Photography <br />