My WebLink
|
Help
|
About
|
Sign Out
RES 09265
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2009
>
RES 09265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2009 12:50:46 PM
Creation date
3/27/2009 12:49:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/24/2009
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 09265
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation and Traffic <br />Findings Regarding Significant Impacts <br />1. Increased traffic and unacceptable levels of service at five Pleasanton <br />intersections <br />Finding. The City finds that the following mitigation measures identified for <br />these four intersections are feasible and have been incorporated into <br />the MMRP, thereby mitigating the impacts to aless-than-significant <br />level: <br />• Improve Hopyard Road at Owens Drive (#10), per MM <br />TR-1.2. <br />[The improvements are included as projects in the City's Traffic <br />Development Fee. The project developers shall pay the traffic fees <br />to address this mitigation.] <br />• Improve Hopyard Road at Stoneridge Drive (#11), per MM <br />TR-1.3. <br />[The proposed mitigation is signal retiming. The City of Pleasanton <br />shall be responsible for this mitigation.] <br />• Improve Santa Rita Road at Stoneridge Drive (#32), per MM <br />TR-1.3(a) <br />[The proposed mitigation includes the creation of new turn lanes. <br />This mitigation shall be the financial responsibility of the Project <br />Sponsor.] <br />• Improve Santa Rita Road at Valley Avenue (#34), per MM <br />TR-1.4. <br />[The proposed mitigation is to construct a second westbound left <br />turn and either widen a northbound right-turn lane or construct a <br />third southbound left turn. These improvements are included as <br />projects in the City's Traffic Development Fee. The project <br />developers shall pay the traffic fees to address this mitigation. The <br />proposed mitigation is also signal retiming. The City of Pleasanton <br />shall be responsible for this mitigation] <br />DEIR, pp. 3.9-35 3.9-36; FEIR 3-20,3-22 <br />2. Increased traffic and unacceptable levels of service at two intersections <br />not within Pleasanton <br />Finding. The City finds that the following mitigation measures are feasible and <br />have been incorporated into the MMRP; however, because these <br />Stoneridge Drive Specific Plan Amendment and Staples Ranch Project <br />Enviromnental Impact Report Findings and Statement of Overriding Considerations Page 31 of 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.