Laserfiche WebLink
A"I"fACHMENT 2 <br />BIU RESULTS <br />BID OPENING -FEBRUARY 25, 2009 <br />TRAFFIC SIGNAL INSTALLATION <br />S"1'ONERIDGE MALL ROAD A'F EMBARCADERO COURT <br />CITY PROJECT' NO. 085054 <br /> Conh'actor Amount <br />I Wingard F,nginecring Inc. $ 259,400.00 <br />2 Angelo Utilities $ 261,800.00 <br />3 Republic ITS $ 283,700.00 <br />4 Pacific Excavation Inc. $ 284,389.00 <br />5 Richard A I leaps, Inc. $ 289,391.00 <br />6 MCH Electric Inc. $ 295,885.00 <br />7 John D. Baker Construction Co. $ 298,825.00 <br />8 Stciny and Company, Inc. $ 301,129.00 <br />9 ~yl3g $ 30?.,696.00 <br />10 Terno Inc. $ 304,440.00 <br />I I Columbia Electric, Inc. $ 308,200.00 <br />12 Beltramo 6lcctric, Inc. $ 311,400.00 <br />I3 Mike Urown Electric Co. $ 325,925.00 <br />14 Tennyson Electric Ina $ 329,319.00 <br />I S Brown & Feslcr Inc $ 345,632.00 <br />16 Dan F,Iccwia $ 349,900.00 <br /> Engineer's L'stimate $ 235,000.00 <br />Note: Bid Results are preliminary -subject to verification by the City of Pleasanton <br />Subcontractor Wot'k to be perforr <br />I Colebank Construction Directional Boring <br />2 Diaz Corp. Roadway Swiping <br />3 Sposeto Engineering Handicap Ramps <br />a <br />