Laserfiche WebLink
ATTACHMENT D <br /> <br /> FINAL REPORT <br /> <br />As required in Section 7, Task IV, Item c) of this Contract, a Final Report on <br />the project shall be submitted by the Grantee to the State Program Manager by <br />November 1, 1985. <br /> <br />The Final Report will completely describe the specific efforts and results of <br />all the leak detection surveys and repairs made during the project. At a <br />minimum the Final Report will include the following: <br /> <br /> a. Copies of all Daily Leak Detection Logs (fully completed), sample <br /> attached. <br /> <br /> b. Copies of all Leak Reports (fUlly completed], sample attached. <br /> <br /> c. Copies of all Leak Repair Reports (fully completed), sample attached. <br /> <br /> d. Maps identifying which mains were surveyed, where leaks were !coated, <br /> the rate of w~ter lost {GPM) at each leak, and which leaks were <br /> repaired. <br /> <br /> e. Summary tables displaying: <br /> <br /> - Total number of leaks detected by Project. <br /> <br /> - Total nuFber of leaks reported during Project from other sources. <br /> <br /> - Total estimated rate of water lost (GPM). from leaks discovered in <br /> Project. <br /> <br /> - Number of miles of main surveyed for leaks. <br /> <br /> - Number and description of listening points. <br /> <br /> - Number of detected leaks repaired. <br /> <br /> - Total number of person hours expanded on leak detection. <br /> <br /> - Total cost of leak detection. <br /> <br /> - Total number of person hours expanded on leak repair. <br /> <br /> - Total cost of leak repair. <br /> <br />29 Contract B-550~2C <br /> <br /> <br />