My WebLink
|
Help
|
About
|
Sign Out
RES 84291
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 12:28:22 PM
Creation date
1/25/2000 8:51:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/12/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
That a sanitary sewer sampling manhole be provided on the <br />sanitary sewer lateral unless otherwise waived by the City <br />Engineer. <br /> <br />That prior to issuance of a building permit, the developer <br />shall pay the applicable Zone 7 and City connection fees and <br />water meter cost for any water meters (irrigation meters) not <br />directly related to a building permit, <br /> <br />That the developer dedicate to the City for street <br />right-of-way purposes those parcels of land intended <br />to be public streets. <br /> <br />That the developer grant an easement to the City over <br />those parcels shown as public service easements (P.S.E.) <br />and which are approved by the City Engineer or other parcels <br />which may be designated by the City Engineer. <br /> <br />35. <br /> <br />That approval of the design for the line, grade, and <br />structural sections for the streets serving this develop- <br />ment be withheld pending final engineering design and <br />review by the City Engineer. <br /> <br />That vertical P.C.C. curbs and gutters be constructed <br />within this development unless otherwise approved by the <br />City Engineer and that the curb and gutter be poured mono- <br />lithically with the sidewalk when the sidewalk is adjacent. <br /> <br />That all existing wells, septic tanks or holding <br />tanks on the site be properly sealed, filled and abandoned <br />prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or <br />special approval is obtained from the City Engineer for <br />temporary use of an existing well for construction water. <br />Any wells designated for abandonment or any wells encountered <br />during construction, are to be destroyed in accordance with a <br />permit obtained from Zone 7 by calling (415) 443-9300. <br /> <br />That the haul route for all materials to and from this <br />development be approved by the City Engineer prior to the <br />start of any construction. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.