My WebLink
|
Help
|
About
|
Sign Out
RES 84284
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 12:02:23 PM
Creation date
1/25/2000 8:40:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/12/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 8: <br /> <br />Prepare an accurate, informative and concise Air Quality <br />Element which includes a non-technical summary of the <br />results of Tasks 1-7 contained herein. The Element <br />will follow the format contained in the state General <br />Plan Guidelines and suggestions from the Bay Area Air <br />Quality Management District. <br /> <br /> (b) Submit technical work required for the General <br /> <br />Plan Coordinator to complete his tasks according to the schedule <br />attached as Exhibit 1. <br /> <br /> (c) Attend meetings with the General Plan Coordinator, <br />City staff and other consultants as necessary to complete the <br />above tasks. Also, attend one Planning Commission and one City <br />Council meeting. <br /> <br /> 3. Sufficiency of Work. Consultant agrees that all <br />professional work shall be adequate and sufficient to meet the <br />purposes for which it is performed. Consultant represents to <br />City, and City is relying upon the representation, that his work <br />will conform to the professional standards normally exercised by <br />professional air quality consultants in the State of California. <br /> <br /> 4o Title to Work. All documents, data, studies, surveys, <br />drawings, maps, and reports furnished to Consultant by City, as <br />well as all such documents, data, studies, surveys, drawings, <br />maps, and reports prepared by Consultant under this agreement, <br />shall be considered the property of the City and shall be turned <br />over to the City at the completion of the services to be performed. <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.