My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
022409
>
04 ATTACHMENT 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 2:42:11 PM
Creation date
2/20/2009 11:55:28 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/24/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENT 10
Document Relationships
10
(Cross Reference)
Path:
\CITY CLERK\AGENDA PACKETS\2009\020309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wage 2 of 2 <br />We need to follow through on commitments t our residents and to other cities for many gears. <br />Dublin, Livermore and the County expect SDE to be built to help the tri- valley traffic problem. As promised, we <br />should be building SDE in concert with our related plans to build El Charro and Dublin Blvd over the next few <br />years. <br />Finally, extending SDE will not turn SD into a freeway as some have claimed. In a worst case, the <br />maximum number of cars that can use SDE to bypass the freeway is about 1,000/hour due to freeway on -ramp <br />monitoring. This is minimal compared to traffic levels our 4 lane arteries such as Valley and Stoneridge were <br />designed for. This is a minimal amount of cars for this roadway and will result in reduced congestion in many <br />other areas of the city that these cars now use. This roadway was designed for thousands of cars as our other 4 <br />lane roads are. <br />In summary, please continue with plans to get Stoneridge Drive built while others are willing to pay. Building it in <br />concert with other regional Mans for related road extensions such as El Charro and Dublin Blvd just makes <br />sense. We need improved circulation to help us get around, and Stoneridge has always been in the plan to <br />provide a 2nd east/west artery in addition to Malley. We need it now! <br />Thank you I <br />Sincerely, <br />Jennifer Fieble <br />4047 Schween court <br />Pleasanton, CA 94566 <br />2/3/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.