My WebLink
|
Help
|
About
|
Sign Out
10 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
020309
>
10 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2009 11:23:47 AM
Creation date
1/28/2009 11:23:38 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/3/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
10 ATTACHMENTS
Document Relationships
04
(Cross Reference)
Path:
\CITY CLERK\AGENDA PACKETS\2009\022409
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pleasanton will be responsible to construct the modification. With the <br />construction of these improvements, this impact will be mitigated.] <br />• Improve EI Charro at Stoneridge, per MM TR-7C (#53). <br />• Seek an Interagency Cooperative Agreement to fund and complete traffic <br />mitigation measures in other jurisdictions, per MM TR-11 C. <br />DEIR, p. 4-18 <br />8. Increased traffic and unacceptable levels of service at three intersections not <br />within Pleasanton. <br />Finding. The City finds that mitigation measures identified for two of the intersections <br />noted below, Fallon Road at Dublin Boulevard (#56) and Tassajara Road at <br />Central Parkway (#60), are feasible and have been incorporated into the <br />MMRP; however, unless the intersection improvements are implemented by <br />the governing jurisdiction where the intersections are located, the impact <br />would remain sign cant and unavoidable. A statement of overriding <br />considerations for this impact is made in the following section. The <br />mitigation measures for the Dublin Boulevard at Dougherty Road <br />intersection (#D1) are infeasible and a statement of overriding <br />considerations for this impact is made in the following section. <br />• Improve Fallon Road at Dublin Boulevard (#56), per MM TR-SC. <br />• Improve Tassajara Road at Central Parkway (#60), per MM TR-9C. <br />Improve Dublin Boulevard at Dougherty Road (#D1), per MM TR-10C. <br />• Seek an Interagency Cooperative Agreement to fund and complete traffic <br />mitigation measures in other jurisdictions, per MM TR-11 C. <br />DEIR, p. 4-18 and FEIR, p. 3-69 <br />STATEMENT OF OVERRIDING CONSIDERATIONS <br />The City has determined to approve the Ice Center Alternative because it provides <br />greater social and economic benefits than the Proposed Project without creating <br />significantly greater environmental impacts. This statement of overriding considerations <br />presents the City's determination that the Ice Center Alternative's broader public and <br />environmental objectives outweigh the anticipated significant and unavoidable <br />environmental impacts of the alternative, as identified in the previous section and the <br />EIR. <br />Significant and Unavoidable Environmental Impacts of the Proposed Project <br />The previous section and the EIR identify the following significant and unavoidable <br />impacts of the Ice Center Alternative, which are substantially the same as those of the <br />Proposed Project: <br />Stoneridge Drive Specific Plan Amendment and Staples Ranch Project <br />Environmental Impact Report Findings and Statement of Overriding Considerations Page 27 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.