Laserfiche WebLink
Job No. 19447.010 <br />Exhibit A <br />Page l l of 12 <br /> 1.5 Design alternatives & preferred Schematic 24 $4,000 <br /> Design__________ <br /> 2,0 Construction Documents _ _ _ 138 _ _ _ _ _ _ _ _ _ _ $15,350 <br /> 2.1 Landscape Construction Plans, Details and 54 $6,600 <br /> <br />-- <br />------ Specs_____ <br />---------------------------- <br />----------- <br />------------ <br />-------------- 2.2 Irrigation Plans, Details and Specs_ _ _ _ _ _ _ _ _ _ _ <br />-- -------------- _ _ _ _ 36 _ _ _ _ _ _ _ _ _ _ _$3,500 <br />---------------- <br />----- - <br />2.3__ <br />- Planting Plans, Details and Specs____________ <br />----- ---------- - ____ 28____ _______$?,?50 <br />----------- 2.4 Pre-bid cost estimate and Bid Documents _ _ _ _ _ _ _ _ _ 20 _ _ _ _ _ _ _ _ _ _ _ $?,500 <br />---------------- <br /> <br />---------------- _ _ <br />- <br />3.0 <br />------ ------------- <br />Reimbursables <br />------------------------------------- <br />_ _ _ NA_ _ _ _ <br />- <br />_ _ _ _ _ _ _$2,000 <br />---------------- <br />Balance Hydrologica ------ ------------------------------------- ----------- ------------ <br />$15,122 <br /> 1.0 Background and Site Inveatip~ationa_ _ _ _ _ _ _ _ _ <br />- _ _ _ _ 18 _ _ _ <br />---- _ _ _ _ _ _ _ $2,180 <br />- <br />---------------- <br />------ --- -- <br />1.1 _ _ <br />- --- ------------ <br />Reseazch, assemble background info <br />------------------ ----------- _ _ _ _ 8_ _ _ _ _ <br />- _ _ _ _ _ _ _ _ $900 <br />---------- 1.2 Coordination with Civil on set-up of topo base _ _ _ _ _ _ 2_ _ _ _ _ _ _ _ _ _ _ _ _ $160 <br /> 1.3 Site visit to assess drainage constraints _ _ _ _ _ 8_ _ _ _ _ _ _ _ _ _ _ _ $?,120 <br />---------------- _ <br />--2.0 <br />--- HydromodificationModelinpx_____________ <br />- -- ------ _ 65 <br />---------- $7.440 <br />------- -- <br />---------------- <br />----- 2.1 _ _ <br />- Coordination with Landscape and Civil_ _ _ _ _ _ _ <br />--------------------- _ _ _ _ 10 _ _ _ _ _ _ _ _ _ _ _ $1,120 <br />----------- 2.2 Develop BAHM modeling for Parking Lot 17 $1,920 <br /> <br />---- _ <br />----- roject_____ <br />--------------------------- <br />----------- <br />------------ <br />------------ 2.3 Develop BAHM modeling for larger corridor 22 $2,530 <br />---------------- <br />___ ------ <br />_ 2.4__ area---------------------------------- <br />Run BAHM models and optimize___________ ----------- <br />____ 16____ ------------ <br />_______$1,870 <br />_____________ <br />----- 3.0 <br />------ HydromodiEication Management Plan _ _ _ _ _ <br />- - ------ ---- ----- _ _ _ 33 _ _ _ <br />--- - _ _ _ _ _ _ $3,414 <br />- <br />----------- 3.1 Prepare Draft HMP and coordinate with 20 $2,057 <br /> Consultant design team <br />--------------- <br />----------- <br />------------ <br />---------------- ------ <br />3.2 ---------------------- <br />Meet w/ City on Draft HMP, revise BAHM 3 $390 <br /> modeling as needed _ _ _ <br />_-- <br />--------------- ~-3.3 Prepare and distributeFinaIHMPReport_____ ___ 10 ___ <br />----- $967 <br />______ <br />--- -- <br />---------------- <br />------- ------ <br />4.0_ _ <br />- -- <br />Project Coordination and Management _ _ _ _ _ _ <br />-- _ _ _ _ 18 _ _ _ _ _ _ _ _ _ _ _$2,088 <br />--------- 4.1 Attenddes~meeting~swithCityandTeam___ ____ 10____ _______$1,340 <br />________________ _ <br />__ <br />4.2 Project coordination on HMP details for Parking 8 $748 <br /> <br />---------------- <br />------ Lot design and construction plans <br />------------------------------------- <br />----------- <br />------------ <br />suetaLitte D~biglt <br />----- ---- ---------- -------- -~-- <br />----------- <br />------ $123U0 <br /> <br />--- 10 <br />------ Preliminary Seryicea_ _ _ _ _ _ _ _ _ <br />-------- ---------- ~ <br />----------- <br />-------$!1c500 <br />------------- 1.1 <br />_ Preliminarylnvestig~ation _________________ <br />------- ____ 10____ _______$1,500 <br />------------ --- _ <br />- <br />_ 1.2__ Prepare Intent Drawing___________________ _____6_ <br />---- ______$1,000 <br />- <br />--------------- <br />- 1.3 <br />------ Coordination and meetings________________ <br />------------------- _ 12 <br />--------- _____$2,000 <br />- <br />--------------- <br />- <br />2.0 _ _ <br />- <br />Design f Conatntction Documents _ _ _ _ _ _ _ _ _ _ <br />_ _ _ _ 46 _ _ - - <br />- - - _ _ - - $7,000 <br />--------------- <br />2.1__ <br />- <br />Pazking Lot LightingDes~--------------- <br />----16_--- <br />___----$2,500 <br />---------------- <br />--- 2.2 _ _ <br />- Gas and Electric Construction Drawings _ _ _ _ _ _ <br />----------------------- _ _ _ _ 20 _ _ _ _ _ _ _ _ _ _ _$3,000 <br />------------- 2.3 <br />_ PrepazeCompositeDrawing_______________ <br />-- _ 10 <br />---------- _______$1,500 <br />---------------- _ <br />- <br />2.4 __________ <br />Overhead Conversion ____NA____ __________ $0 <br />---~-~---------- __ <br />- 3.0 __________ <br />Reimbursables NA $1000 <br />P:\199CTOlfia\Conmcl\194C) OIOCity-PW senbn-'ItenspCorridor-FxhibiFASwpe&fm090105 doc <br />