Laserfiche WebLink
Job No. 19447.010 <br />Exhibit A <br />Page 10 of 12 <br />EXHIBIT A <br />PROPOSAL -SUMMARY OF FEES <br />I. Client agrees to pay compensation to Consultant for the Services contained in EXHIBIT A, PART I on a Time and <br />Materials Not-[o-Exceed basis. Time and Material charges for these Services are estimated to be as follows: <br />MacKay & Somps $78,900 <br />Civic BnQirteers <br />------ -- ------ _ _ _ <br /> 1.0 Coordinationf Meetings <br />------------- ----108 --- <br />- ------ $17,350 <br />- <br />---------------- _ <br />----- <br />1.1 ----_ <br />Bi-weekly meetings, incl. 50% and 90Yp design 42 $6,600 <br /> meetings <br />------------ <br />----------- <br />------------ <br />---------------- ----- <br />1.2 ------------------------- <br />Coordination with City Landscape Architect 2 $350 <br /> and Project Landscape Architect on site design <br />-------------------- <br />----------- <br />------------ <br />---------------- ------ <br />1.3 ----------------- <br />______ <br />CoordinationwithProject Team ____ 20____ _______$3,600 <br />---------------- __ <br />- <br />1.4 ______ <br />----------------- <br />Coordination with adjacentproperty owners_ <br />-- <br />_ _ _ 10 _ _ _ _ <br />- <br />_ _ _ _ _ _ _ $1,600 <br />---------------- _ _ <br />- <br />1.5 ---------------- <br />Misc. coordination with USA, Potholing 10 $1,600 <br /> Contractor and Bid coordinafion _ _ <br />- - - - - - - - - - - <br />- - -1.6 Project Administration for Consultant Team _ _ _ <br />---------- _ _ _ <br />_ _ _ 20 _ _ _ <br />----- _ _ _ _ _ $3:600 <br />-- -- <br />----------- - <br />- - - - ------ <br />2.0 -- ------------------ <br />_______________ <br />Research(DesignBase ____ 89____ ______ $19,850 <br />---------------- <br />__ <br />- <br />2.1 <br />____ <br />Survey Control <br />---------- <br />_ _ _ 16 <br />- ---- <br />_ _ _ _ _ _$3,100 <br />- <br />---------------- _ _ <br />- <br />2.2 --------------- <br />Obtain supplemental field topography by 18 $3,700 <br /> <br />---- <br />------ survey--------------- <br />----------------- <br />----------- <br />------------ <br />------------ 2.3 Pothole survey of existing utilities <br />----------- _ _ _ 13 _ _ _ _ <br />- _ _ _ _ _ _ _ $2,650 <br />---------------- <br />Subtrorac _ _ <br />- ---------- <br />Potholing Contractor <br />-------------------- NA <br />----------- _ _ _ _ _ _ _$5,000 <br />_ _ _ _ _ - _ _ _ _ _ _ _ _ _ <br />2.4 -- <br />Review As-built plans and Constructlon 10 $1,600 <br /> documents <br /> <br />2.5 _ <br />Prepare base map from survey control _ _ _ _ _ _ <br />- _ _ <br />_ _ _ _ 20 _ _ _ <br />---- <br />_ _ _ _ _ _ _ $3,000 <br />- <br />---------------- ------ <br />2.6 -- -- ----- <br />Review ofGeotechnicalreport______________ _____5_____ $800 <br />_ <br />- - - - - - - - - - - _ <br />__ <br />3.0 Design' Construction Documents _ _ _ _ _ _ _ <br />----- --- _ _ _ 265 _ _ _ <br />--- - _ _ _ _ _ _$38,700 <br />- <br />----------- - <br />- - - - --- -- <br />3.1 --- ---------- <br />Preliminazy Destgn analysis and re~ort_ _ _ _ _ _ _ _ _ _ _ 54 _ _ _ _ _ _ _ _ _ _ _ $7,650 <br />---------------- _ _ <br />- <br />3.2 -- <br />Prepazefinalelectronicbasefile_____________ <br />____ 16 ____ <br />_______ $2,050 <br />--------- ------ __ <br />- <br />3.3 -- <br />50%DesignandIm~rovementPlans_________ <br />____ 88____ <br />______$12,100 <br />------------- -- _ <br />__ <br />3.4 --- <br />90% Desk and Improvement Plans <br />------------- <br />_ _ _ 52 _ _ _ _ <br />- <br />_ _ _ _ _ _ _ $7,100 <br />--------- -- _ <br />3.5 -- <br />Final Improvement Plans and Specifications <br />--- _ _ _ 36 _ _ _ _ <br />- _ _ _ _ _ _ _$5,200 <br />---------------- <br />_ _ Finn Design Group _ _ <br />- <br />_ _ _ _ _ _ --------- <br />Structural Engineering (as needed) _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ $3:000 <br /> 3.6 Cost Estimate and Bid Documents <br />---------- 10 <br />----------- $1,600 <br />------------ <br />---------------- <br />---------------- ------ <br />4.0__ <br />- --------------------------- <br />Reimbursables------------------------- <br />----NA_--- <br />-------$3c000 <br /> <br /> <br />i~-~r{ <br />~ <br />~~ <br />~ <br />4 > ~ a } <br />~4~Yf~p_ It ~e YZ Mi ~ 7"yt <br />' <br />V s <br />~ yl VI '4 <br />:' <br />, <br />pSS,, <br />1 3+1 <br />w Qi <br />'h <br />Y ( 3 48' <br />~ <br />'' i <br />~ <br />l <br />~ k ~ <br />' <br />~:~ <br />t <br />7 <br />.~w~°.~i lit ..w <br />-- •- <br />10 ;i:ri ~{. 3.-~.-u ~..m s <br />S <br />~ <br />.l <br />fE <br />-•• .. <br />----------- <br />Schematic Design . <br />i <br />~ <br />+t -Y <br />----104---- ~.-. s <br />rro <br />~ -1i~ <br />__----$10,200 <br /> 1.1 ------------ <br />Coordination with City Landscape Architect <br />---- _ _ _ _ _ 2_ _ _ _ _ _ _ _ _ $350 <br />---------------- _ _ <br />- 1.2 projectmasterplans <br />Review adjacent __ 2 ___ ______ $350 <br /> 1.3 ____ <br />_ <br />Coordination and Bi-weekly meetings with City, 24 $4,000 <br /> incl. 50% and 90% design meetings <br />------ <br />----------------- <br />------------------ <br />----- 1.4 ----------------------- ---------------- <br />H dro-modification lan coordination 12 $1,500 <br />P\19/C'Mffice\COntract\1941'/.OIO~CnY-%e> roran-iranspComdor-E.Aibrc-ASmpe&fces090105 doc <br />