My WebLink
|
Help
|
About
|
Sign Out
RES 84039
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2012 12:12:19 PM
Creation date
12/29/1999 8:15:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/24/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
notice of assignment in each case upon such allocation. <br />4. Building Permit Limitation. The Court Orders <br />provide that the Sewer Permits are subject to the exclusive <br />control of the City. The Court Orders further provide that <br />a written agreement between a property owner and the City, <br />precluding the owner or its successor or assigns from <br />obtaining the necessary building permits for a specified <br />period of time tolls for that period of time, the three year <br />period for obtaining building permits. <br /> <br /> A. The Owner of Parcel 1 shall not be entitled <br /> <br />to obtain building permits during the term of this Amended <br />Agreemcnt except during the period~ and subject to the <br />limitations described below or upon the use or expiration of <br />all Parcel 1 Sewer Permits in accordance with Paragraph 5. <br />In each case, the reference to the number of Parcel 1 Sewer <br />Permits which may be used shall mean that Owner shall not be <br />entitled to obtain building permits which, based on the <br />sewer demand formula being generally applied by the City at <br />the time, shall require Sewer Permits in excess of the <br />number which may be used pursuant to this Paragraph. <br /> <br /> (1) Time Period for use of Parcel 1 Permits. <br /> Owner may use the number of Parcel 1 Sewer Permits in <br /> connection with construction of any buildings during <br /> the period commencing on the later of May 1, 1986 or a <br /> date Ninety (90) days after completion of the <br /> <br /> 10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.