My WebLink
|
Help
|
About
|
Sign Out
ORD 1985
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
12/15/2008 12:30:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
12/2/2008
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1985
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26. The proposed project shall be a "green home" with a minimum of points in each <br />category (Resources, Energy, and IAQ/Health) required for a Certified Rating. <br />The applicant shall achieve the 105 points for each home as outlined in the initial <br />checklist submittal. Exceptions may be permitted at the discretion of the Director <br />of Community Development. The green building measures shall be shown on <br />one of the first two pages of the plans submitted for issuance of a building permit. <br />Each point identified shall have a notation showing which sheet the item can be <br />found. A special inspection by a representative from the Planning Division shall <br />be coordinated with regard to landscaping, irrigation, and exterior materials. All <br />of the green building measures indicated on the approved checklist shall be <br />inspected and approved by either the City of Pleasanton or a qualified specialist, <br />or the applicant shall provide written verification by the project engineer, architect, <br />landscape architect, or designer. <br />27. The applicant shall implement the following measures in the design and <br />construction of the approved residential structures, to provide roof-mounted <br />photo-voltaic systems in the future: <br />a. Electrical conduit and "pull-strings" shall be installed from the roof/attic areas <br />to the building's main electrical panel(s). <br />b. Roof trusses shall be "engineered" to handle an additional load of five pounds <br />per square foot beyond that of the load anticipated for roofing. <br />c. An area shall be provided near the electrical panel for the "inverter" required <br />to convert the direct current output from the photovoltaic panels to alternating <br />current. <br />d. A bi-directional electrical meter shall be installed at such time any <br />photo-voltaic panels are installed. <br />These measures shall be shown on the building permit plan set submitted to the <br />Director of Community Development for review and approval before issuance of <br />the first building permit. The building developer shall provide the necessary <br />information and the plans delineating how the photovoltaic panels are applied on <br />the roof prior to issuance of a building permit. The roof-mounted photovoltaic <br />systems shall be physically and visually integrated with the structure's roof <br />materials and design, e.g., surface-mounted, low profile, etc., to the satisfaction <br />of the Director of Community Development. <br />28. All exterior lighting including landscape lighting shall be directed downward and <br />designed or shielded so as to not shine onto neighboring properties. The <br />project/building developer shall submit a final lighting plan, and include drawings <br />and/or manufacture's specification sheets showing the size and types light <br />fixtures proposed for the exterior of the buildings and parking areas. The light <br />fixtures and their locations shall be subject to the review and approval of the <br />Planning Division. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.