My WebLink
|
Help
|
About
|
Sign Out
ORD 1985
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
12/15/2008 12:30:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
12/2/2008
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1985
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building Conditions <br />29. The building permit plan check materials will be accepted for submittal only after <br />the ordinance approving the PUD development plan becomes effective, unless <br />the project developer submits a signed statement acknowledging that the plan <br />check fees may be forfeited in the event that the ordinance is overturned or that <br />the design is significantly changed. In no case will a building permit be issued <br />prior to the effective date of the ordinance. <br />30. All structures covered by this approval shall be constructed to: <br />a. meet Title 24 state energy requirements, and <br />b. comply with all codes and ordinances in effect before the Building and Safety <br />Division will issue permits. <br />31. The project developer shall submit two copies of the site soils report to the Chief <br />Building Official for third-party peer review and shall pay for such review at the <br />time specified by the Chief Building Official, but in all cases before the issuance <br />of a grading permit. <br />32. All conditions of approval for this case and the final approved green building <br />checklist shall be printed in all building permit plan check sets submitted for <br />review and approval. These conditions of approval and green building checklist <br />shall be on, at all times, all construction plans kept on the project site. It is the <br />responsibility of the property owner to ensure that the project contractor is aware <br />of, and abides by, all conditions of approval and the green building requirements. <br />Prior approval from the Planning Division must be received before any changes <br />are constituted in site design, grading, building design, building colors or <br />materials, etc. <br />33. A construction trailer may be allowed on the site for daily administration/ <br />coordination purposes during the construction period. At no time shall campers, <br />trailers, motor homes, or any other vehicle be used as living or sleeping quarters <br />on the construction site. All such vehicles shall be removed from the site at the <br />end of each workday. <br />34. The approved building materials and colors shall be stated on the building permit <br />plans to the satisfaction of the Director of Community Development. <br />Substitutions shall not be allowed unless otherwise approved by the Director of <br />Community Development. <br />35. The building developer shall post address numerals on the building so as to be <br />plainly visible from all adjoining streets or driveways during both daylight and <br />night time hours, according to the requirements of the Building and Safety <br />Division and Fire Department. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.