Laserfiche WebLink
installation. All required inspections and witnessing of tests shall be completed <br />prior to final inspection and occupancy of the building. <br />Engineering and Tentative Map Requirements <br />71. A tentative map is required be submitted to the Planning Division for review and <br />approval after the final PUD approval. <br />72. Prior to approval of the final map, the applicants shall create a joint <br />maintenance agreement for the private access drive. The agreement shall be <br />subject to review and approval by the City Attorney prior to recordation of the final <br />map. The drive shall be maintained to the satisfaction of the City Engineer. <br />73. The developer shall submit the following information to the City Engineer for <br />review and approval: <br />a. Two prints of the final map <br />b. One copy of the preliminary title report <br />c. One set of the computer closures <br />d. One legible copy of the latest recorded deed for the parcels being subdivided <br />e. One legible copy of the recorded deeds for each of the adjacent properties <br />unless those properties are part of a recorded map which has been recorded <br />within the last seven years <br />f. One legible copy of the Recorded Final map, Parcel Map, or Record of <br />Survey used to prepare this Map. <br />74. The final map shall meet all requirements of the Subdivision Map Act. <br />75. The tentative map shall contain a brief legal description of any parcel being <br />re-subdivided, a statement of lot and total acreage, and a statement referencing <br />any separate documents required to be recorded with the map. <br />76. The project developer/subdivider shall add a reference sheet to the final map <br />indicating the location of the vegetated/bioswales on the lots. The project <br />developer/subdivider shall designate these areas as non-buildable areas, and <br />shall disclose this information to the prospective lot owner. The exact language of <br />the disclosure shall be reviewed and approved by the City Attorney before the final <br />map is recorded. <br />77. The project developer/subdivider shall install all utility boxes and transformers for <br />this project underground. Capacitor banks and/or switches for the project may be <br />installed above ground if properly screened to the satisfaction of the Director of <br />Community Development. <br />78. The project developer/subdivider shall install all utility lines (PG&E Pac Bell and <br />Cable TV) underground in conduit to the nearest utility approved riser pole. The <br />developer/subdivider shall be responsible for paying apro-rata share as <br />13 <br />