Laserfiche WebLink
Proiect Description <br />T- Mobile engaged the City in numerous discussions which looked at the existing <br />proposed site, alternative sites, and alternative designs including a flag pole design <br />described later in this report. Ultimately, the applicant proposed that the City consider a <br />project that contained the following: <br />o A modification of the existing tower that include a small tower on top of it. This <br />added smaller tower would house eight antennas and the supporting Base <br />Transceiver Station (BTS) system. <br />o The added tower would be approximately nine feet in height. As it would be <br />installed as an integral part of the tower element, the net increase in the <br />overall tower height is approximately seven feet. <br />The revised proposal is compared to the existing elevation in the elevations provided on <br />the next page. <br />OPOmw WIT IN •IInTIYM <br />i1PIWIP011110 PYT PL •VM1OI <br />Zoning Administrator <br />The Zoning Administrator found that the revised design would maintain the building's <br />architectural integrity and that the tower extension would be proportionally scaled. The <br />Zoning Administrator approved Case No. PDRW -6 subject to conditions of approval (See <br />Attachment 1). <br />Page 3 of 8 <br />