Laserfiche WebLink
Water Operations and Maintenance (O & Ml and Debt Service Funds <br />The Water Operating Fund highlights include: <br />- Ending Fund Balance of $10.12 million. <br />- $881,452 deficit of revenues and transfers compared to expenditures. <br />- Water sale revenues were $749,466 less than budget projections at <br />$15.45 million. <br />- Expenses were over budget by $96,980. Zone 7 water costs were <br />$1,287,228 more than budgeted but this was mitigated by cost savings in <br />other areas: <br />/ personnel costs ($385,196) <br />/ professional services ($70,465) <br />/ electricity ($113,703) <br />/ subsidies ($304,723) <br />/ interfund expense ($130,536) <br />Sewer Operations and Maintenance (O & M) and Debt Funds <br />The Sewer Operating Funds highlights included: <br />- Ending Fund Balance of $3.98 million. <br />- Budgeted draw down of $410,507 from Fund Balance was actually lower <br />at $214,646. <br />- Revenues were as budgeted at $11.4 million, except for approximately <br />$81,000 in additional interest income. <br />- Budget savings included salaries of $31,387, DSRSD regional sewer <br />costs of $12,000 (the largest budgeted cost at $7.6 million), and interfund <br />cost savings of $39,082. <br />Residential sewer charges are based on fixed rates and do not follow the same trends as water <br />consumption (especially summer irrigation water). Therefore, the projected versus actual <br />variances are often larger for water rate revenues than for sewer rate revenues, which include <br />both local revenues and regional revenues [passed on to the Dublin San Ramon Services <br />District (DSRSD) for sewer treatment and to the Livermore-Amador Valley Water Management <br />Agency (LAVWMA) for export]. <br />For the Sewer Fund O&M (Operations and Maintenance), the minimum target level for reserves <br />for this smaller enterprise is between 25%-30% of annual revenue (10% to 15% for contingency, <br />15% for two months cash flow), or about $3.2 million. Currently, the Sewer O&M Fund has a <br />Fund Balance of $3.98 million. On the other hand, sewer infrastructure replacement reserves <br />(that reside in the CIP) are at less than optimum levels. A review of sewer replacement funding <br />is currently in progress. <br />CALLIPPE PRESERVE GOLF COURSE OPERATING FUND <br />The Callippe Preserve Golf Course operating funds consist of the Golf Course Operator Fund <br />(reports on the actual operations of the golf course), the Golf General Fund, Contributed Capital <br />Fund, and the Replacement Fund. The total fund balance for all three golf operating funds is <br />$2,354,749. This is $164,574 more than anticipated and the majority of the variance is <br />explained by the actual operations of the golf course. <br />Page 6 of 9 <br />