My WebLink
|
Help
|
About
|
Sign Out
RES 84007
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2012 4:34:28 PM
Creation date
12/29/1999 7:54:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/9/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDM <br /> CAMP DRESSER & McKEE INC. <br /> environmental engineerS, scientists, <br /> planners, &management consultants 710 South Broadway. Suite 201 <br /> Walnut Creek. California 94596 <br /> 415 933-2900 <br /> <br />December 20, 1983 <br /> <br />Mr. Robert L. Narni ck <br />Director of Public Works and <br />City of P1 easanton <br />P. O. Box 520 <br />P1 easanton, CA 94566 <br /> <br /> Water System Improvements along <br /> Foothill Road <br /> <br />Dear Bob: <br /> <br />Earlier this year the need for water system improvements along Foothill <br />Road was identified. These improvements will be required at the time <br />Foothill Reservoir is placed in service in order to provide fire flows <br />at adequate pressure along Foothill Road from Foothill High School <br />southerly to Sunol Boulevard, and to maintain an appropriate volume of <br />water in Santa Ranch Reservoir for service to uphill lands along Santos <br />Ranch Road. <br /> <br />SCOPE OF SERVICES <br /> <br />In view of the need for water system improvements, CDM proposes to per- <br />form the following services: <br /> <br />Phase One - Analysis <br /> <br />Task 1 - Review previous CDM work in connection with the December <br /> 1981 report for the north central and north west portion <br /> of the Lower Pressure Zone. <br /> <br />Task 2 - Using current information, update the water demands used <br /> in connection with the December 1981 report for the Lower <br /> Pressure Zone. ' <br /> <br />"/ask 3 .- Develop two or more piping/booster pump/Santos Ranch <br /> reservoir schemes that could provide appropriate water <br /> service to the lands along Foothill Road. <br /> <br />Task 4 - Prepare data for computer input, and perform computer <br /> simulations of each of the schemes from 'Task 3. <br /> <br />Task 5 - Interpret the computer simulations. <br /> <br /> DEC 2 o J83 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.