Laserfiche WebLink
CAMP DRESSER & McKEE INC, <br /> <br /> Mr. Robert L. Warnick <br /> December 20, 1983 <br /> Page 2 <br /> <br />Task 6 - Repeat Tasks 4 and 5 as needed to locate and size the <br /> pipes, booster pumps, storage at the existing Santos <br /> Ranch reservoir, and other improvements. <br /> <br />lask 7 - Meet with the City staff and review the schemes and the <br /> facility location and sizes for each scheme. Jointly <br /> decide upon the most appropriate scheme. <br /> <br />Task 8 - Prepare a brief written report setting forth the recom- mended scheme. <br /> <br />Phase iwo .:_.Design <br /> <br />Task 9 - Prepare Preliminary Design of Water System Improvements <br /> <br />Task 10 - Meet with the City <br /> <br />Task 11 - Prepare Final Design <br /> <br />Task 12 -. Prepare Construction Plans, Specifications and Bid Documents, <br /> <br />Phase Three - ConstruCtion Services <br /> <br />Task 13 - Assist in Soliciting Bids from Contractors <br /> <br />Task 14 - Respond to Bid Inquiries <br /> <br />Task 15 - Assist in Evaluation of Construction Bids <br /> <br />Task 16 - Participation in Preconstruction Conference <br /> <br />Task 17 - Shop Drawing Review <br /> <br />Task 18 - Assist with Change Orders <br /> <br />Task 19 - Liaison with City Staff <br /> <br />~ask 20 - Construction Inspection <br /> <br />Task 21 Final Inspection <br /> <br />Task 22 - Prepare As-.Built Drawings <br /> <br /> <br />