My WebLink
|
Help
|
About
|
Sign Out
RES 85583
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2012 4:12:17 PM
Creation date
12/29/1999 7:42:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/17/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDM CAMP DRESSER & McKEE INC. <br />environmental engineerS, scientists, <br />planners, &management consultants 710 South Broadway. Suite 201 <br /> Walnut Creek. California 94596 <br /> 415 933-2900 <br /> <br /> December 3, 1985 <br /> <br /> Mr. Robert T. Okamura <br /> City Engineer <br /> City of Pleasanton <br /> P.O. Box 520 <br /> Pleasanton, CA 94566 <br /> <br /> Water System Improvements <br /> <br /> Dear Bob: <br /> <br /> In performing the Water Master Plan study, we have determined that addi- <br /> tional water system improvements are needed in 1986 for the City to con- <br /> tinue to provide adequate water service throughout Pleasanton. During the <br /> past several months, we have discussed these needs and on May 13th, we <br /> wrote a letter to Bob Warnick describing in detail the needed improvements. <br /> <br /> On September 4th we submitted a proposal to you and, as a result of our re- <br /> cent discussion regarding the proposal, you requested that we prepare a <br /> revised proposal that would separate out the initial work on two of the <br /> water system improvements. We have done as you requested and are pleased <br /> to submit this revised proposal. <br /> <br /> SCOPE OF SERVICES <br /> <br /> The needed improvements are: <br /> <br /> 1. A new turnout from the Zone 7 system to meet 1986 and future deli- <br /> very needs. Also, remove pipe and valve restrictions at the <br /> existing Turnout Nos. 1, 2, 3, and 4. <br /> <br /> Estimated Cost of Construction: $200,000 for new turnout, and <br /> $10,000 each for the four existing turnouts = $240,000. <br /> <br /> 2. A relocated Foothill Booster Pump Station No. 1 that would be con- <br /> structed downhill from the existing pump station on Longview <br /> Drive. With the pump station at a lower elevation, the suction <br /> pressure for the pumps will be appropriate. Some of the existing <br /> pumps, motors, piping, and electrical service may be utilized at <br /> the new site. <br /> <br /> Estimated Cost of Construction: $150,000 <br /> <br /> 3. New pump, motor, piping, and electrical facilities at individual <br /> booster pump systems for homes west of Foothill Road that will be <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.