My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
120208
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2008 12:19:52 PM
Creation date
11/25/2008 10:54:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/2/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />On May 20, 2008, Pleasanton's City Council awarded the contract for the project to <br />George Bianchi Construction Inc. in the amount of $162,148.73. The City Council also <br />authorized the Director of Public Works to approve change orders up to the project <br />contingency amount of $33,000. Change orders included additional sidewalk repairs <br />and the addition of Greenwood Drive for a total amount of $30,073.34. The subject <br />project has since been completed and is ready for acceptance. The contractor was <br />charged with liquidated damages for the amount of $2,500 for not completing the work <br />within the specified number of working days established in the contract document. <br />The project consisted of the removal and replacement of concrete curb and gutter, <br />sidewalk, driveways and curb through drains and installation of new access ramps on <br />various City streets as shown on Attachment 1. <br />Sidewalk maintenance is a part of an ongoing annual program. The locations are <br />selected from the Streets Division's work order requests and prioritized based on <br />severity of tripping hazards. Curb and gutter locations are selected from drainage <br />problem areas and where severe cracking and displacement of curb and gutter are <br />observed. The repair locations also include damaged sidewalk and curb and gutter sites <br />evaluated by the City's Engineering Division. <br />DISCUSSION <br />Budget <br />A summary of the project's funding sources and expenditures is presented in <br />Attachment 2. The construction cost was increased by $30,073.34, as the Streets <br />Division identified additional locations with tripping hazards requiring the replacement of <br />sidewalk. Staff recommends moving the balance amount of $15,857.59 to a future <br />sidewalk maintenance project, CIP No. 085012, Annual Sidewalk Maintenance. <br />Submitted by: <br />.~ <br />ti~~ <br />Brian Dolan <br />Director of <br />Community Development <br />Fiscal Review: <br />~-~' ' , <br />David P. Culver <br />Director of Finance <br />Approved y: <br />Nelson Fialho <br />City Manager <br />Attachments: <br />1. List of Project Locations <br />2. Funding and Expenditure Summary <br />Page 2 of 2 <br />