BACKGROUND <br />On May 20, 2008, Pleasanton's City Council awarded the contract for the project to <br />George Bianchi Construction Inc. in the amount of $162,148.73. The City Council also <br />authorized the Director of Public Works to approve change orders up to the project <br />contingency amount of $33,000. Change orders included additional sidewalk repairs <br />and the addition of Greenwood Drive for a total amount of $30,073.34. The subject <br />project has since been completed and is ready for acceptance. The contractor was <br />charged with liquidated damages for the amount of $2,500 for not completing the work <br />within the specified number of working days established in the contract document. <br />The project consisted of the removal and replacement of concrete curb and gutter, <br />sidewalk, driveways and curb through drains and installation of new access ramps on <br />various City streets as shown on Attachment 1. <br />Sidewalk maintenance is a part of an ongoing annual program. The locations are <br />selected from the Streets Division's work order requests and prioritized based on <br />severity of tripping hazards. Curb and gutter locations are selected from drainage <br />problem areas and where severe cracking and displacement of curb and gutter are <br />observed. The repair locations also include damaged sidewalk and curb and gutter sites <br />evaluated by the City's Engineering Division. <br />DISCUSSION <br />Budget <br />A summary of the project's funding sources and expenditures is presented in <br />Attachment 2. The construction cost was increased by $30,073.34, as the Streets <br />Division identified additional locations with tripping hazards requiring the replacement of <br />sidewalk. Staff recommends moving the balance amount of $15,857.59 to a future <br />sidewalk maintenance project, CIP No. 085012, Annual Sidewalk Maintenance. <br />Submitted by: <br />.~ <br />ti~~ <br />Brian Dolan <br />Director of <br />Community Development <br />Fiscal Review: <br />~-~' ' , <br />David P. Culver <br />Director of Finance <br />Approved y: <br />Nelson Fialho <br />City Manager <br />Attachments: <br />1. List of Project Locations <br />2. Funding and Expenditure Summary <br />Page 2 of 2 <br />