My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
120208
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2008 12:19:52 PM
Creation date
11/25/2008 10:54:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/2/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />- ° -~~ °~ ° ~`~ ~~~~~'' ~ "" CITY COUNCIL AGENDA REPORT <br />pL~~s~N-r~N~ <br />December 2, 2008 <br />Community Development <br />Engineering Division <br />TITLE: ACCEPTANCE OF PUBLIC IMPROVEMENTS PERFORMED BY GEORGE <br />BIANCHI CONSTRUCTION INC. FOR ANNUAL SIDEWALK <br />MAINTENANCE, CIP NO. 075012 <br />SUMMARY <br />The subject project consisted of removal and replacement of damaged concrete <br />sidewalk, driveways, curb and gutter, and curb through drains and installation of new <br />access ramps on various City streets as shown in Attachment 1. The subject project is <br />complete and ready for acceptance by City Council. <br />RECOMMENDATION <br />1. Accept the improvements for the subject project. <br />2. Authorize the City Clerk to file a Notice of Completion <br />3. Authorize payment of the retention in the amount of $9,611.10 to George Bianchi <br />Construction, Inc. thirty days after recordation of the Notice of Completion. <br />4. Authorize final payment to George Bianchi Construction, Inc. in the amount of <br />$3,077.93 <br />5. Transfer the project balance in the amount of $15,857.59 to CIP No. 085012, <br />Annual Sidewalk Maintenance. <br />FINANCIAL STATEMENT <br />This project replaced and upgraded existing infrastructure and should not increase <br />maintenance costs. The construction of the project was performed within the approved <br />budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.