Laserfiche WebLink
BISSELL & KAFiH, IHC. <br /> <br /> 4. Prepare specifications including bid proposal, in accordance with City <br /> requirements. <br /> <br /> 5. Prepare a legal description and plat of the right-of-way required for <br /> the channel improvement. City to provide preliminary title report. <br /> <br /> 6. Prepare channel cross-sections at 100' O.C. based on topographic <br /> information supplied by the City. Calculate grading quantities based on <br /> these cross-sections. <br /> <br /> 7. Perform necessary coordination with Alameda County Flood Control and <br /> Water Conservation District for project approval. Coordination with the <br /> City and County of San Francisco and other agencies is limited to the <br /> submittal of plans for their review. <br /> <br />D. CHA/iNEL IMPROVEMENT PLANS - REACH 3 <br /> <br /> 1. Prepare improvement plans for Reach 3. The work shall be as outlined <br /> under Paragraph C. The transition structure at Sunol Boulevard is part <br /> of the work. <br /> <br />E. STORM DRAIN CULVERT - REACH 6 <br /> <br /> 1. Provide technical assistance for the design of the box culvert that is <br /> to be constructed as part of the new Bernal Avenue street improvements. <br /> <br /> <br />