Laserfiche WebLink
BISSELL & KAF~Iq, INC. <br /> <br /> SCOPE OF HORK <br /> <br /> Phase Two Engineering Services For Off-Site Improvements <br /> <br /> Senior Citizen's Housing Project <br /> C'ity of Pleasanton <br /> <br /> A. PARCEL MAP <br /> <br /> Prepare tentative and final parcel map for the 37 acre site in <br /> conformance with the requirements of the City/County and the State <br /> Subdivision Hap Act, suitable for recordation. The map will consist of <br /> a parcel defining the 9.2 acre Senior Citizen's Housing Site, a <br /> remainder parcel, and the "A" Street dedication. <br /> <br /> ~. STREET IMPROVEMENT PLANS AND SPECIFICATIONS <br /> <br /> 1. Prepare street improvement plans for the portion of "A" Street fronting <br /> the g.2 acre Senior Citizen's Housing site. The information shown on <br /> the plans shall be sufficient for construction of the east one-half of <br /> the street and underground utilities and shall include street grades, <br /> sanitary sewer and laterals, storm drain inlets and laterals, water <br /> mains and laterals, driveway centerlines, fire hydrant locations, street <br /> light locations, and monuments. The main storm drain line design is not <br /> a part of this work. <br /> <br /> 2. Prepare a preliminary quantity and cost estimate after the first check <br /> plans have been submitted to the City. Prepare a final quantity- <br /> estimate based on approved plans. <br /> <br /> 3. Prepare specifications including bid proposal, in accordance with City <br /> requ~ ramants. <br /> <br /> C. STORM DRA~N AND CHANNEL ~MPROVEMEHTS PLANS - REACHES ~, 2, 4 AND 5 <br /> <br /> ~. Finalize hydraulic design of Reaches ~ through 7 and obtain conceptual <br />, design approval from Alameda County Flood Control and Water Conservation <br /> Distr~ct prior to preparing improvemen~ plans. City to provide field <br /> work and surveying necessary to determine the location and elevation of <br /> existing underground utilities~-tha~ may conflict with the proposed <br /> improvements. <br /> <br /> 2. Prepare improvement plans for Reaches .~, 2, ~ and 5. The ~nformation <br /> shown on the plans shall be sufficient for construction of the channel <br /> and storm drain system and shall ~nc]ude channel centerlines, mainte- <br /> nance roads, fencing, side ditch location with grades, lateral pipe <br /> entries and the 'transition structure at Nestern Pacific Railroad. <br /> <br /> 3. Prepare a preliminary quantity and cost estimate after the first check <br /> plans have been submitted to the City. Prepare a final quantity <br /> estimate based on approved plans. <br /> <br /> <br />