Laserfiche WebLink
27. The applicant shall implement the following measures in the design and <br />construction of the approved residential structures, to provide roof-mounted photo- <br />voltaic systems in the future: <br />a. Electrical conduit and "pull-strings" shall be installed from the roof/attic <br />areas to the building's main electrical panel(s). <br />b. Roof trusses shall be "engineered" to handle an additional load of five- <br />pounds per square foot beyond that of the load anticipated for roofing. <br />c. An area shall be provided near the electrical panel for the "inverter" <br />required to convert the direct current output from the photovoltaic panels to <br />alternating current. <br />d. A bi-directional electrical meter shall be installed at such time any photo- <br />voltaic panels are installed. <br />These measures shall be shown on the building permit plan set submitted to the <br />Director of Planning and Community Development for review and approval before <br />issuance of the first building permit. The building developer shall provide the <br />necessary information and the plans delineating how the photovoltaic panels are <br />applied on the roof, prior to issuance of a building permit. The roof-mounted <br />photovoltaic systems shall be physically and visually integrated with the <br />structure's roof materials and design, e.g., surface mounted, low profile, etc., to <br />the satisfaction of the Director of Planning and Community Development. <br />28. All exterior lighting including landscape lighting shall be directed downward and <br />designed or shielded so as to not shine onto neighboring properties. The <br />project/building developer shall submit a final lighting plan, and include drawings <br />and/or manufacture's specification sheets showing the size and types light <br />fixtures proposed for the exterior of the buildings and parking areas. The light <br />fixtures and their locations shall be subject to the review and approval of the <br />Planning Division. <br />Buildintt Conditions <br />29. The building permit plan check materials will be accepted for submittal only after <br />the ordinance approving the PUD development plan becomes effective, unless the <br />project developer submits a signed statement acknowledging that the plan check <br />fees may be forfeited in the event that the ordinance is overturned or that the <br />design is significantly changed. In no case will a building permit be issued prior to <br />the effective date of the ordinance. <br />30. All structures covered by this approval shall be constructed to: <br />a. Meet Title 24 state energy requirements, and <br />b. Comply with all codes and ordinances in effect before the Building and <br />Safety Division will issue permits. <br />6 <br />