Laserfiche WebLink
Exhibit A <br />Scope of Services <br />Bernal Community Park Phase 2 <br />Harris Design <br />Prepared 10/9/08 <br />Page 1 of 8 <br />Basic Services <br />1.0 Schematic Design <br />1.01 Kick-Off Meeting <br />Meet with project ceam and City Staff m verify project schedule, define specific steps and work <br />products for the Schematic Design phase, confirm the preliminary scope of construction, <br />discuss the Ciry's project goals, confirm City standards, specifications and standard plans <br />format, and establish projec[ managemen[ and communication procedures. Prepare meeting <br />notes for this and all other project meetings. <br />1.02 Topographic Survey <br />An aerial topographic survey for the Phase 2 azea will be prepared by Bellecci & Associates at a <br />scale of 1" = 20", with one-foot contour intervals and spot elevations. Aerial topographic survey <br />to cover Phase 2 limits of work and 100 feet beyond. Following the aerial survey, Bellecci will <br />spend two days of field crew time to collect supplemental field survey points for the design <br />team. Bellecci will also allow for another move-in for field survey points during the CD phase. <br />1.03 Geotechnical Report <br />A geotechnical report will be prepared by Miller Pacific Engineering Group that will provide <br />recommendations for site pavements, compaction, earthwork, seismic and foundation design <br />criteria, and synthetic turf drainage. The recommendations will be based on laboratory testing <br />of soils collected with at leas[ 6 borings at 10 feet deep. <br />1.04 Site Analysis <br />Walk the site to verify all visually apparent features. Review Phase 1 and future Phase 3 <br />conditions for integration with Phase 2. Create digital photo log. Collect soil samples fot <br />horticultural analysis. <br />1.05 Data Review <br />Review available project-related information as made available by the Ciry, including but not <br />limited to the Bernal Community Park Master Plan and Specific Plan, Phase 1 plans and <br />specifications, Phase 1 construction cost, scheduling, and change order data, Phase 1 <br />geotechnical report, and Phase l topographic survey. <br />L06 Initial Program Definition <br />Prepare an initial design program narrative for site and buildings. Describe each program <br />element in sufficient detail to establish the general design character, approximate sizes, and other <br />quantifiable parameters. <br />1.07 Base Data <br />Prepare CAD base sheets. Establish CAD standards and projec procedures. <br />