My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
102108
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 11:25:35 AM
Creation date
10/16/2008 11:25:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/21/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 11 <br />RUGGERI-JENSEN-AZAR E""'""HS " r`"""E"s ' S°"°`°""s <br />Two revisions to the plans based on City comments. <br />D. S1pn1nP and Striping Pfan <br />The Consultant will prepare a 1"=40' signing and striping plan showing signage and <br />striping only at trail crossings per the City requirements. <br />E. Eneineer's Opinion~Probable Constrnctlon Costs <br />The Consultant will prepare an estimate ofprobable construction costs after first submittal <br />check plans are completed, and will update the estimates based on the City approved plans. <br />F. Coordination and Meeting <br />The Consultant will attend meetings and coordinate with the City, and other project <br />consultants to discuss and address issues during the improvement plan process. We have <br />budgeted 32 hours for this task. Additional hours will be billed as extra. <br />G. Landscape Plans <br />The landscape plans will include the following areas: <br />The small amount of landscaping along the Old Vineyard Avenue (now a trail) at <br />the Safreno property. <br />The final planting and irrigation plans for the north site ofNew Vineyard Avenue. <br />Planting and irrigation plans for the new staging area for the trail near the <br />intersection of Old and New Vineyard adjacent to the Molinaro property. <br />The construction documents will include the following: <br />Safreno Properly <br />a. Final planting including all plant material locations and call-outs, plant list, <br />legend, notes and details necessary for installation. <br />b. Irrigation plan (it is our understanding that this system will connect to the <br />Safreno waterservice) with legend, notes and details necessary for installation. <br />4'~WminVds-02M2102Tvineyerd RVl.~l wpd ~} --- - <br />J Iw1uI IR)A) ImIio11C1eM) <br />
The URL can be used to link to this page
Your browser does not support the video tag.