My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
102108
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 11:25:35 AM
Creation date
10/16/2008 11:25:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/21/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1\ <br />RUGGERI-JENSEN-AZAR <br />ENGIN[FRS PLAN NF RS SURVE YURS <br />EXHIBIT "A" <br />SCOPE OF WORK <br />This Scope of Work is prepared for the City of Pleasanton (Client) by Ruggeri-Jenscn-Azar & <br />Associates (Consultant). <br />Scope of Work <br />This Scope of Work is prepared for the Vineyard Avenue Trail on Old Vineyard Avenue, and is <br />based on the plans for Vineyard Alignment and Trail project, prepared by Thomas Baak & <br />Associates, dated May 7, 2003. <br />I. BASIC SERVICES <br />A. ,Fypplemental To~raohic Survey <br />The Consultant will provide field survey to update the current topographic map for the <br />Vineyard Avenue Corridor Specific Plan Infrastructure improvements. This scope ofwork <br />includes locating new improvements constructed on Old Vineyard Avenue by the adjacent <br />development, top of curb, pavement, driveway elevations, existing trees, exiting manholes <br />and valve boxes and providing supplemental topo survey for the old S curve area. We have <br />budgeted a total of 32 hours for this task. <br />8. s Ma <br />The Consultant will prepare a computer generated base map based on the supplemental <br />topographic survey and record improvement plans. The base map will be provided to the <br />project landscape architect and will be used for preparation ofthe trail improvements plans. <br />C. ~nrovement Plans <br />The Consultant will prepare one set of 1 "=40' improvement plans showing 12' of the <br />existing AC pavement to remain with one layer of AC overlay and 8' of the existing AC <br />pavement to be ground and compacted for equestrian trail. The improvement plans will <br />include the following: <br />1. Driveway improvements at Safreno property. <br />2. Trail conform at existing private property driveways. <br />3. Street and sidewalk improvements at trail crossings. <br />4. Technical specifications in the form of notes on the plans. Stand along <br />specifications are not included in this scope of work. <br />(i:UJmwVub-0?•AilO:TViryard irail.p01 wpl - <br />2 ImIiY1R1A) Iid1iY lClirnll <br />
The URL can be used to link to this page
Your browser does not support the video tag.