Laserfiche WebLink
80. The applicant shall enter into an agreement with the City, approved by the City <br />Attorney, which guarantees that all landscaping installed as part of this project, <br />including landscaping in the City right-of-way, will be maintained at all times in a <br />manner consistent with the approved landscape plan for this development. Said <br />agreement shall run with the land for the duration of the existence of the <br />structures located on the property. <br />Green Building <br />81. The approved green building checklist shall be shown on one of the first two <br />pages of the plans submitted for the issuance of a building permit. The sheet <br />number(s) where each checklist item is addressed in the plan set shall be noted <br />on the checklist. All proposed green building measures shall be shown <br />throughout the plan set, as appropriate, as determined by the Director of <br />Planning and Community Development and the Chief Building Official. <br />82. The Building and Safety Division may require special inspections for the green <br />building measures proposed. If required, the applicant shall provide verification <br />to the Planning Division clearly stating that the Building and Safety Division has <br />inspected and approved all applicable special inspections relating to green <br />building measures. Said verification shall be provided prior to occupancy of the <br />home. <br />83. The applicant shall implement the following measures with the construction of the <br />apartment structures covered by this approval so that a roof-mounted <br />photovoltaic system can be installed in the future: <br />a. Install electrical conduit and pull string from the roof/attic areas to the <br />building's main electrical panels; <br />b. Engineer the roof trusses to handle an additional load as determined <br />by a structural engineer to accommodate the additional weight of a <br />prototypical photovoltaic system beyond that anticipated for roofing; <br />and <br />c. Provide an area near the electrical panel for the "inverter" required to <br />convert the direct current output from the photovoltaic panels to <br />alternating current. <br />These measures shall be indicated on the building permit plan sets. <br />Building Conditions <br />84. The buildings shall meet the applicable Title 24 state energy requirements. <br />13 <br />