My WebLink
|
Help
|
About
|
Sign Out
PC 09/09/1998
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
1990-1999
>
1998
>
PC 09/09/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2017 4:02:25 PM
Creation date
10/7/2008 9:48:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
9/9/1998
DOCUMENT NAME
09/09/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Saturday from 8:00 a.m. to 5:00 p.m., as the applicant requested and the neighbors agreed with, until <br />such time that building is enclosed. Further, he will support the application with the modification that it <br />not contain a termination date for the work, with the work proceeding as expeditiously as possible. <br />Commissioner Maas commiserated with the neighbors on the intrusion on quiet weekend time due to <br />allowing weekend construction; however, she stated her concurrence with getting the project completed <br />in a timely manner and with allowing Saturday work to shorten the duration of construction time and <br />allowing neighbors to regain their peace and quiet and with construction not starting before 8:00 a.m. on <br />Saturdays. <br />Chairperson Kumazan stated that the neighbor troubled by noise issues is not located in close proximity <br />to this project and, therefore, he will support approval of the application. <br />PUBLIC HEARING WAS <br />In response to a statement by Commissioner Sullivan relating to work performed on Saturday only being <br />roof related, Mr. Parodi described the construction necessary to complete the roof work. <br />PUBLIC HEARING WAS CLOSED <br />A motion was made by Commissioner Cooper, seconded by Commissioner Roberts, approving <br />Case Z-98-234, subject to the condition that Saturday work from 8:00 a.m. to 5:00 p.m. be related <br />to enclosing the house until enclosure is completed. <br />ROLL CALL VOTE <br />AYES: Commissioners Cooper, Maas, Roberts, Sullivan, and Chairperson Kumazan <br />NOES: None <br />ABSENT: None <br />ABSTAIN: None <br />Resolution No. PC-98-70 was entered and adopted as motioned. <br />(Recess taken.) <br />d. AP-98-OS (V-98-07/Z-98-1621. Rod and Barbara Kerr <br />Appeal of the Zoning Administrator's decision regarding an application for a variance <br />from the Municipal Code and for administrative design review to construct cone-story garage <br />and workshop addition three feet from the northeastern side property line where seven feet is the <br />required setback. The subject site is located at 5664 Paseo Navarro. Zoning for the property is <br />R-I-6,500 (single-family residential) District. <br />Mr. Iserson referenced a staff reported dated September 9, 1998, and highlighted key areas contained in <br />the staff report including the background, zoning administrator hearing, and analysis. In conclusion, Mr. <br />PLANNING COMMISSION MINUTES Page 7 September 9, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.