My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
100708
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2008 2:51:49 PM
Creation date
9/30/2008 2:51:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/7/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />On January 15, 2008 Pleasanton's City Council awarded the contract for the referenced <br />project to McNamara and Smallman Construction Inc. in the amount of $451,895. The <br />City Council also authorized the Director of Public Works to approve change orders up <br />to the project contingency amount of $45,200. The subject project has since been <br />completed and is ready for acceptance. <br />The subject project consisted of removing existing damaged sanitary sewer mains, <br />laterals and manholes and installing new industry standard sewer mains, laterals with 2- <br />way cleanout and manholes along Old Bernal Avenue, Bernal Court, Amaral Circle. and <br />parts of Mirador Avenue (see Attachment 1). Street improvements included the <br />replacement of curb, sidewalk, driveways, traffic striping and landscaping. The project <br />locations were selected from a list generated by the Utilities Division and coordinated <br />with the City's street resurfacing schedule. <br />DISCUSSION <br />Budget <br />A summary of the project's funding sources and expenditures is presented in <br />Attachment 2. The construction cost was reduced by the amount of $9,340 due to a <br />decrease in the estimated quantity of sewer laterals and curb and gutter replacement. <br />Since additional funds were appropriated from the Sewer Replacement Fund balance at <br />the award of contract, staff recommends the remaining balance of $54,794 be <br />transferred back into the Sewer Replacement Fund. <br />Submitted by: <br />~~ ~~~ <br />Brian Dolan <br />Director of <br />Community Development <br />Fiscal Review: <br />David P. Culver <br />Director of Finance <br />Approved by: <br />~~~ ~~ <br />Nelson Fialho <br />City Manager <br />Attachments: <br />1. List of Project Locations <br />2. Funding and Expenditure Summary <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.