Laserfiche WebLink
EXHIBIT "i-A" <br /> TASK ORDER NO. 1 <br /> SCOPE OF SERVICES <br /> <br /> BACKGROUND <br /> <br />The City of Pleasanton, through the North Pleasanton Im- <br />provement District (NPID), is proposing to finance and con- <br />struct major improvements to three interchanges on Inter- <br />state Routes 580 and 680. The proposed improvements are: <br /> <br /> o Addition of an interchange at the Stoneridge <br /> Drive/I-680 overcrossing <br /> <br /> o Addition of a new interchange on 1-580 at Hacienda <br /> Drive <br /> <br /> o Modifications to the existing Santa Rita Road/I-580 <br /> interchange <br /> <br /> o Addition of freeway auxiliary lanes on 1-680 and <br /> 1-580 in conjunction with the above projects <br /> <br />The conceptual geometrics of the proposed improvements have <br />been developed in previous studies and have been approved by <br />Caltrans. <br /> <br />The purpose of this TASK ORDER is to perform the necessary <br />studies and procedures to prepare a Project Report and Envi- <br />ronmental Assessment for formal clearance and approval of <br />the proposed improvements by Caltrans and the Federal High- <br />way Administration (FHWA). This TASK ORDER presumes that an <br />Environmental Assessment (EA) leading to a Finding Of No <br />Significant Impact (FONSI) will be the appropriate mechanism <br />for environmental certification. <br /> <br /> SCOPE OF SERVICES <br /> <br />CH2M HILL's work is described in the following tasks. <br /> <br />TASK 1-1: ADMINISTRATION <br /> <br />CH2M HILL will be the prime contractor with the City of <br />Pleasanton for all services for this project. Subconsul- <br />tants will contract with CH2M HILL. The subconsultants will <br />be Earth Metrics for environmental work, TJKM for traffic <br />work and Bruce Fraser Associates for assistance in agency <br />coordination. Subtasks for the work in this task are: <br /> <br /> <br />