My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
091608
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2009 1:21:04 PM
Creation date
9/10/2008 9:52:14 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/16/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION <br />In June 2008, the City Council appropriated $84,709 from the Golf Course Replacement <br />Reserve to complete Phase I of the sand bunker replacement project at Callippe <br />Preserve Golf Course. Phase I consisted of replacing the inferior sand in 31 greenside <br />bunkers with much higher quality sand, as well as cleaning out the drainage system. <br />This work was completed in August 2008 at a cost of $79,500, a savings of over $5,000. <br />At the time of the original approval, staff indicated that two (2) additional replacement <br />phases were planned for FY 2009 and FY 2010 at an approximate cost of $150,000, <br />which would complete the project. <br />Phase I was completed at a lower cost than originally anticipated, including several <br />additional bunkers. Staff and the golf course Superintendent recommend accelerating <br />the replacement of the fairway sand bunkers by combining the two (2) remaining <br />phases into one (1) project, to commence in late September and be completed by early. <br />November 2008. <br />Combining the phases accomplishes several objectives: 1) golfers are inconvenienced <br />only once, rather than in successive years; 2) the Phase I contractor can be utilized, as <br />there are no scheduling conflicts during this time period; and 3) a cost savings will be <br />realized through economies of scale. <br />As noted above, the original estimate for the two (2) remaining phases was $150,000. <br />By combining Phases II and III, the project cost can be reduced to $132,695, a savings <br />of $17,000 (a specific breakdown is attached). The current Golf Course Replacement <br />Reserve balance (after payment of the Phase I work) is $111,000. To complete the <br />remaining bunkers in the current year, the Council would need to authorize an advance <br />of $22,000 from the Callippe Preserve operating budget to the Replacement Reserve. <br />As discussed, $82,000 is scheduled to be added to the Replacement Reserve in July, <br />2009 as part of the FY 2010 operating budget. If the Council approves the $22,000 <br />advance, those funds would be credited back to golf course operations, and the FY <br />2010 Replacement Reserved reduced to $60,000. This would provide sufficient funding <br />($133,000) to complete the sand bunker project by November 2008. <br />Submitted by: <br />t <br />am s W. Wolfe <br />ctor of Parks and <br />Community Services <br />Fiscal Review: <br />~~~~ <br />David P. Culver <br />Director of Finance <br />Approved by: <br />Nelson Fialho <br />City Manager <br /> <br />Page 2 of 2 <br />