My WebLink
|
Help
|
About
|
Sign Out
RES 85236
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:45:51 PM
Creation date
12/27/1999 10:58:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/7/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electric Company Revtsad Cal. P.U.C. Sheet No...11s2,-c <br /> San Francisco, California Cancelling .,.,~ ..~ Cal. P.U.C. Sheet No, lnqR~-r, <br /> <br /> RULE N0. 15 '- GAS NAIN EXTENSIONS <br /> <br /> Extension of gas distribution matns necessary to furnish permanent gas service to applicants will <br /> be made by the Utility in accordance with the following provisions: <br /> <br /> A, General: The Utility will constructJ ownj operate and matntatn gas distribution main extensions <br /> only along public streets, roads end highways which the Utility has the legal right to occupy, <br /> and on public lands and private property 8cross which rights of way satisfactory to the Utility <br /> may be obtained without cost or condemnation by the Utility. <br /> <br /> B. FREE EXTENSIONS TO INDIVIDUAL APPLICANTS FOR PRIORITY P1 SERVICE <br /> 1. FREE FOOTAGE ALLOWANCES <br /> Gas main extensions will be made by the Utility at its own expense provided the length of <br /> main required does not exceed the free length as determined from the following allowances: <br /> <br /> a. RESIDENTIAL USE <br /> For space heating equipment: <br /> For the first lO,O00 Btu per hr. input capacity .......... 7 feet <br /> Additional per 10,000 Btu per hr. input capacity ......... 5 feet <br /> For each gas range custer .................... 50 feet <br /> For each automatic storage type gas water heater customer ..... BO feet <br /> For each gas refrigerator customer ................ 10 feet <br /> For each gas clothes dryer custor4r ................ lO feet <br /> For air conditioning equipment of lO,0OO Btu per hr. input <br /> capacity or more, lOmDO0 Btu per hr. input capacity ....... 20 feet <br /> For each swinering pool heater customer .............. 20 feet <br /> b. USE OTHER THAN RESIDENTIAL <br /> For space heating equipment: <br /> For the first 10,000 Btu per hr. input capacity ......... 7 feet <br /> Additional, per lOmO00 Btu per hr. Input capacity ........ 5 feet <br /> For cooking, per lO,O00 Btu per hr. input capacity ........ 7 feet <br /> For Incidental domestic water heater or refrigerator on ,~, <br /> co~merctal premises the allowances of B.l.a. apply. <br /> For all other equipment of lOmO00 Btu per hr. input capacity or <br /> more, per 10,000 Btu per hr. input capacity ........... 20 feet <br /> <br /> 2, CONDITIONS <br /> a. SEASONAL, I NTERHITTENT AND STANDBY SERVICE: When an applicant will use gas service tn <br /> establishments occupied seasonally or intermittently, as in seasonal resortsm cottages or <br /> other part-year establtshmentsm one half of the allowance provided above will apply. <br /> allowance will be made for equipment used for standby or emergency purposes only. <br /> b. LENGTH AND LOCATION: The length of main required for an extension will be considered as <br /> the distance along the shortest practical route, as determined by the Utility, from the <br /> Utility's nearest distribution main. <br /> <br /> 3. MAIN EXTENSIONS BEYOND THE FREE LENGTH <br /> a. ADVANCES <br /> (1) Extensions of mains beyond the free length wilt be made by the Utility provided <br /> applicants for such extensions advance to the Utility $?.45 for each foot of main in <br /> excess of the free length. Such extensions will be owne'e"~,operated and maintained <br /> by the Utility. <br /> (2) In cases where more than one applicant is to be served from the same extension, <br /> the total free length thereof will equal the sm of the individual allowances <br /> made to each applicant as computed in accordance with Section B.1. The amount <br /> to be advanced by the members of the group shall be apportioned among them in <br /> such manner as they shall mutually agree upon. <br /> <br /> (Continued) <br /> <br />Advice Letter No. 1277-C Issued By Date Filed June 28, 1984 <br />Decision No. W.M. Gallavan Effective September 19, 198~, <br /> Vice-President Resolution No. c-2598 <br /> BRANOS(B09) p.3 Rates and Economic An~lv~k <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.