My WebLink
|
Help
|
About
|
Sign Out
RES 85232
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:11:41 PM
Creation date
12/27/1999 10:56:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/7/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~luth and Go~c~,, <br /> <br /> April 22, 1985 29666-2279 <br /> <br /> Mr. R.L. laarnick <br /> Director of Public Norks <br /> City of Pleasanton <br /> PO Box 520 <br /> Pleasanton, CA 94566-0802 <br /> <br /> Subject: Sports Park <br /> Phase IV-B <br /> <br />Dear Bob: <br /> <br />We are pleased to respond to your RFP DE Apri 1 ] 0, ]_985 <br />requesting a fee proposal for the design of a remaining <br />uncompleted portion of the Sports Park. ~e propose to perform <br />the work according to the following s~edu].e: <br /> <br />!. Design Items 1 through 7 <br /> Maximum Fee $19,000 <br />2. Design Item 8 <br /> Maxim~ Fee 800 <br /> <br /> Total Maximum Fee $19,800 <br /> <br />~e propose that our work be performed on a time-and-materials <br />basis according to the attached fee s~edule up to, but not <br />exceeding, the above quoted maximg amo~ts. If construction <br />staking is desired, we will provide it for an additional <br />$3,500. <br /> <br />To support our in-house engineering staff, we have engaged the <br />services of Ken Art~mian of AKA, Inc. and Frank Boyd, <br />electrical engineer, both of iota worked with our team on the <br />previous project. Mr. Boyd, now an independent consultant, <br />was an employee of Sullivan Engineers when he designed the <br />electrical system for the original complex in 1983. <br /> <br />The design work included in this proposal includes the <br />preparation of plans, specifications and estimate for the <br />facilities outlined in your RFP. Also included is the <br />performance of an "as-built" topo survey to support our design <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.