Laserfiche WebLink
Ruth and Going, inc. <br /> <br />April 22, 1985 29666-2279 <br /> <br /> CHARGE RATE SCHEDULE <br /> FOR ENGINEERING AND LANDSCAPE DESIGN SERVICES <br /> <br /> Effective through December 3!, 1985 <br /> <br />Hourly Fees of Office Staff <br /> <br /> Clerical $32 00 <br /> Junior Drafter 24.00 <br /> Drafter 30 00 <br /> Senior Drafter 35 00 <br /> .h~nior Engineering Technician 33 00 <br /> Engineering Technician 43 00 <br /> Senior Engineering Technician 50 00 <br /> Junior Engineer 40 00 <br /> Assistant Engineer 4800 <br /> Associate Engineer 60 00 <br /> Senior Engineer 69.00 <br /> Field Engineer/Construction Coordinator 69.00 <br /> Principal Engineer 85.25 <br /> 2-Person Field Party 108.00 <br /> 3-Person Field Party 135.00 <br /> Manager of Field Operations 69.00 <br /> Electrical Engineer (Boyd) 66.00 <br /> Principal Landscape Ard~itect (AKA) 66.00 <br /> .Associate Landscape Architect (AKA) 49.50 <br /> Landscape Drafter (AKA) 33.00 <br /> Landscape Clerical (AKA) 27.50 <br /> <br /> (Field Rates include personnel, vehicle and normal field equipment, <br /> stakes and materials) <br /> <br />Expenses <br /> <br />Reproduction, communications and other expenses are billed at cost x 1.25. <br />Consultant's charges are billed at cost x 1.!0 <br /> <br />Computer Services and Data Processing are billed at $0.50 per CPU (Central <br />Processing Unit) second. <br /> <br />Electronic Distance Measuring Equipment is billed at $25 per-hour of use. <br /> <br />Delivery services (other than 1st Class US Mail) are charged as Additional <br />Services at Time-and-Materials Rates (in-house), or at cost x !.lO (if by <br />others). <br /> <br />Cost of printing Final Plans and Specifications for bidding or construction <br />purposes is d~arg~1 at reproduction rates as Additional Services. <br /> <br /> <br />