Laserfiche WebLink
~April 25, 1985 <br />Page Two <br /> <br /> SERVICES NOT INCLUDED <br /> <br /> We have not included the following services in our proposal: <br /> <br /> 1. Acoustical consulting fees. <br /> 2. Structural or seismic calculations which may be required <br /> for equipment, material, or supports. <br /> 3. Construction compliance and certification. <br /> 4. Reimbursabl~ expenses for such items as reproduction, travel <br /> copying, printing, etc. <br /> 5. Substantial modifications'to the building plumbing systems. <br /> 6. Detailed construction budgets. <br /> <br /> ASSUMPTIONS <br /> <br /> We have made the follbwing assumptions in the development of <br /> this proposal: <br /> <br /> 1. Our proposal is based on discussions during our meeting <br /> of April 23, 1985. <br /> 2. Minimum changes are required to the air distribution <br /> ductwork within the building. <br /> 3. We will not be asked to make dimensionally accurate <br /> as-built drawings. <br /> <br /> FEE STRUCTURE <br /> <br /> We will perform the above design services on fixed price basis <br /> as detailed below: <br /> <br /> PHASE I - CONSTRUCTION DOCUMENTS. : $ 3,100.00 <br /> PHASE II - CONSTRUCTION OBSERVATION : $ 780.00 <br /> <br /> TOTAL $ 3,880.00 <br /> TERMS OF PAYMENT <br /> <br /> Invoices will be issued monthly on orabout the 30th for services <br /> performed'to date. A final invoice shall be issued when we have <br /> completed our services. The net invoice amount shall be due and <br /> payable ten (10) days from the invoice date. Past due acocunts <br /> will be subject to a late payment charge of 0.0493% per day <br /> (18% per annum). <br /> <br /> ACCEPTANCE <br /> <br /> Your signature in the space provided below will authorize us to <br /> proceed with the work as described above. <br /> <br /> <br />