My WebLink
|
Help
|
About
|
Sign Out
RES 85223
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:06:27 PM
Creation date
12/27/1999 10:52:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/7/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including appurtenant on and off ramps at Stoneridge Mall, and <br /> structure widening to five lanes. <br /> <br />2. Landscaping and irrigation. <br /> <br />3. Right of way acquisitions. <br /> <br />4. Interconnected signal systems. <br /> Route 680 and 580 Widening <br /> <br />1. Construction of two additional lanes (one in each direction) <br /> from Stoneridge Drive Interchange at State Route north to <br /> interchange at State Route 580, including structure widening, <br /> landscaping and soundwalls. <br /> <br />2. Construction to two additional lanes (one in each direction) <br /> from interchange at State Route 680/580, easterly on Route 580 <br /> to Santa Rita Interchange, including structure widening, <br /> landscaping and soundwalls. <br /> <br /> Hopyard Interchang~ <br /> <br />1. Construction of additional bridge widening at Hopyard <br /> overcrossing of State Route 580 including appurtenant ramp <br /> improvements. <br /> <br />2. Landscaping and irrigation. <br /> <br />3. Right of way acquisitions. <br /> <br />4. Interconnected signal system. <br /> Santa Rita Interchange <br /> <br />1. Construction of interchange improvements at Santa Rita Road <br /> overcrossing at Route 580 including bridge widening and ramp <br /> improvements. <br /> <br /> 2. Landscaping and irrigation. <br /> <br /> 3. Right of way acquisitions. <br /> <br />4. Interconnected signal system. <br /> <br /> Hacienda Interchange <br /> <br />1. Construction of overcrossing at Route 580 and Hacienda Drive, <br /> including overcrossing structure, and ramp improvements. <br /> <br />2. Landscaping and irrigation. <br /> <br />3. Right of way acquisition. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.