My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
090208
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2008 11:40:05 AM
Creation date
8/27/2008 11:40:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/2/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />City of Pleasanton <br />I~`. PROJf:CT Dr. l.n~r.rz~ <br />Project Understandigg <br />The City of Pleasanton is currently updating its General Plan document, and anticipated future <br />modifications To the roadway network have resulted in a need for a more detailed analysis of the <br />access to Interstate 680. Based on these changes, the City of Pleasanton is requesting a detailed <br />traffic operations evaluation of the Interstate 680 southbound ramps with Bernal Avenue. The <br />evaluation will review the existing vehicular traffic volumes and operation of the ramp location, but <br />will focus principally on the evaluation of future traffic volume forecasts and potential modification <br />to the ramp layout to meet the future traffic demand. Multiple design alternatives for the on-ramp <br />and off-ramp locations will be studied and a preferred alternative will be further evaluated and <br />drafted to determine the feasibility of the design and The next steps in the design process. <br />a <br />r <br />c <br />a <br />0 <br />a <br />Scope of Services <br />IV. Project Delivery <br />Based on conversations with City staff, we are proposing the project to be divided into two phases: <br />Phase 1 -Preparation of an existing conditions and future Traffic operations alternatives analysis <br />at the intersection of I-680 southbound ramps with Bernal Avenue. <br />Phase 2 -Preparation of a geometric design feasibility study for the preferred alternative I-680 <br />southbound ramps aT Bernal Avenue. <br />Phase 1- Traffic Operations Malysis <br />Task 1.1 -Project Kick-off Meeting <br />KHA will initiate the project through a kickoff meeting with the City of Pleasanton to finalize the <br />project requirements, project schedule, and To collect available traffic data. Data to be collected <br />from the City include: <br />Existing AM and PM turning movement counts <br />General Plan Year Future AM and PM turning movement volumes <br />24-hour approach volumes <br />Collision Data for the past 3 years (SWITRS) <br />Synchro transportation model for the study area <br />Existing GIS Aerial topography data <br />Existing interchange planning documents <br />14 <br />^~^ eMAmdehs, Inc <br />TL820087.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.