My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
090208
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2008 11:34:33 AM
Creation date
8/27/2008 11:34:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/2/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br />WEST LAS POSITAS MEDIAN LANDSCAPING, PHASE 2 <br />THIS CONTRACT is made and entered into this 2nd day of September, 2008, by <br />and between Suarez and Mudoz Construction, Inc., ("Contractor"), whose address is <br />20975 Cabot Boulevard, Hayward, California 94545, and telephone number is (510) <br />782-6065, and the CITY OF PLEASANTON, a municipal corporation ("City"). <br />WITNESSETH: <br />WHEREAS, the City has awarded to the Contractor a contract for WEST LAS <br />POSITAS MEDIAN LANDSCAPING, PHASE 2. <br />NOW, THEREFORE, in consideration of the mutual promises set forth herein, <br />the parties agree as follows: <br />Work to be Performed. The project consists of the complete renovation of eleven (11) <br />median islands on West Las Positas Boulevard, from Cranwood Court to Boardwalk <br />Street. <br />Said work is more particularly shown in the following documents, which are on <br />file with the Department of Public Works of the City and are incorporated herein <br />by this reference: <br />A. Plans and Specifications entitled the WEST LAS POSITAS <br />MEDIAN LANDSCAPING, PHASE 2 and addenda thereto, if <br />any. <br />B. Contract Change Orders approved by the City Engineer, done in <br />accordance with the Standard Specifications. <br />C. The proposal submitted to the City by the Contractor. <br />2. Compensation. The City shall pay the Contractor for work actually performed at <br />the unit prices set out in the Contractor's proposal to the City. The quantities of <br />work stated therein are estimates only; actual quantities will be measured for <br />payment in accordance with the specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.