Laserfiche WebLink
a. Review and approve the plans and specifications. <br /> <br /> b. Inspect the construction of the added parking, sidewalk and <br /> <br /> upgraded landscaping unless this function is delegated to ZONE 7. <br /> c. Pay ZO~Z 7, upon billing, for the additional design and <br /> <br /> construction cost of 17 parking spaces and one-half of the <br /> designated construction cost of the sidewalk. Design costs are to <br /> be based upon'ZONE 7's agreement with their architectural <br /> consultant, J. Jack Bras & Associates, which includes a fee of <br /> 7.75% of construction costs. Construction costs are to be based <br /> upon actual bid prices. <br /> <br />2. Responsibility of Zone 7 <br /> <br /> ZONE 7 agrees to do the following: <br /> <br /> a. Prepare all plans, specifications and estimates for the ZONt 7 <br /> <br /> Administration Building Project, including all CITY related items <br /> and modifications to the Project as a result of CITY review. <br /> <br /> b. Secure all responsible agency approvals, permits, and other <br /> requirements. <br /> c. Administer and inspect the Project's contract and bill CiTY for <br /> those items of responsibility cited in Section 1. <br />3. O~ership <br /> a. Upon acceptance of construction by both agencies, the owmership of <br /> the 28-space parking lot, landscaping and sidewalk east of the east <br /> boundary of ZONI 7's 0.9-acre parcel containing their <br /> administration building shall rest with CITY. ZONE 7 and its <br /> patrons may use said parking lot. <br /> <br /> (2) .. <br /> <br /> <br />