My WebLink
|
Help
|
About
|
Sign Out
RES 85144
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 12:43:27 PM
Creation date
12/22/1999 11:42:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/26/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert [. Warnick -5- February 1, 1985 <br /> <br /> Related to the system expansion, the system map needs to be updated, <br /> and some existing interconnect cables in the field need to be <br /> re-wired and re-spliced. The costs related to these support items <br /> are estimated to be $26,000 for the recommended initial system <br /> expansion from 32 to 64 signals, .and $6,000 for the system expansion <br /> later from 64 to 128. <br /> <br /> SU~i~IAI!Y <br /> <br />In view of the expectations coming from all sides, including the City, <br />citizen committees, and the developers, we recon~nend that the following <br />immediate actions be taken by the the Prudential Insurance Company of <br />America and Callahan-Pentz Properities after receiving approval from the <br />City. <br /> <br />1. Place orders for the hardware required for the expansion of the <br /> Multisonics VMS-220 to a 64-signal master. The turnaround time for <br /> this item is approximately 60 days at Multisonics. <br /> <br />'2. Place orders for nine SICU's. The turnaroun~ time for these <br /> controllers is between 30 to 60 days at Multisonics. <br /> <br />3. Request TJKM to prepare modification plans, and Rosendin Electric to <br /> install required monitoring facilities for the nine intersections <br /> recommended for immediate action. This work can be completed in <br /> about 45 to 60 days. <br /> <br />In summary, we recommend the expansion of the master to 64 intersections <br />to be done in the spring of 1985 and funded by NPID. An additional <br />expansion to 128 intersections should be carried out by the cities of <br />Pleasanton and Dublin, probably in 1985 or 1986, after an agreement'is <br />reached between the two cities on sharing the signal master. <br /> <br />We should ultimately plan to monitor 33 intersections in the Pleasan'ton <br />Area. Of these, 22 are responsible by NPID, nine of the 22 are built <br />and can be upgraded immediately in the field costing an estimated <br />$184,000. This work should be commenced immediately and accomplished in <br />the spring of 1985 and be funded by NPID. Remaining monitoring can be <br />accomplished by the City or, in the case of unconstructed signals, as <br />they are initially installed. <br /> <br />The total cost of recommended improvements to provide the recommended <br />capabilities is $242,000 + $15,000 + $61,000 + $111,000 + $26,000 + <br />$6,000 = $461,000. The NPID ' s share wotll d be $327,000; the City of <br />Pleasanton's share would be $39,500; and the City of Dublin's share <br />would be $94,500. If the City of Dublin does not link up with the <br />Pleasanton master, no additional (or reduced) costs are anticipated for <br />the City of Pleasanton, the NPID or any other parties. <br /> <br />We are requesting that the City of Pleasanton approve the concepts <br />recommended in this lettel' and set aside a total of $327,000 to <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.