My WebLink
|
Help
|
About
|
Sign Out
RES 85144
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 12:43:27 PM
Creation date
12/22/1999 11:42:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/26/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert L. Warnick -4- February 1, 1985 <br /> <br /> ( <br /> Master Expansion <br /> <br /> The system master located in Pleasanton City Hall currently has a <br /> holding capacity of 32 signals. Its holding capacity can be <br /> expanded in increments of 16, up .to 256 signals. A minimum capacity <br /> of 144 signals is necessary for accommodating the projected 116 <br /> signalized intersections and 23 SICU' s- The estimated total costs <br /> 'for the expansion alternatives are as follows: <br /> <br /> Total Cost of Expansion <br /> Per A'dded <br /> Total I ntersecti on <br /> <br /> 32 Signal Master (Existing) - - <br /> <br /> 64 Signal Master $ 33,000 $1,050 <br /> INorth Pleasanton Area) <br /> <br /> 128 Signal Master $111,000 .o' $1,160 <br /> (Pleasanton/Dubl in 5-year Plan) <br /> <br /> 144 Signal Master $137,000 $1,220 <br /> (Pleasanton/Dubl in Build-out) <br /> <br /> Expanding the master to support 128 signals is recommended, as a <br />~- 96-signal capacity will almost surely be insufficient by 1995, and <br /> the cost of expansion is likely to be much higher in the future than <br /> it is now. Although not all of the signal locations shown in Figure <br /> 1 can be included in the 128-signal system, it is projected that the <br /> recommended system can handle all the signals to be interconnected <br /> within the next ten years, because some of the projected signals <br /> will not be installed before 1995~ It is recommended that the NPID <br /> ~ be responsible for expanding the master to a 64-signal system with <br /> accessories necessary for the master to be ready for further <br /> expansion to a 128-signal system. These accessories cost a total of <br /> $11,000. Also, it is recommended that the cities of Pleasanton and <br /> Dublin share equally the cost of $67,000 for completing the <br /> expansion of the master from a 64-signal to a 128-signal system. <br /> <br /> The expanded system capacity for each geographical area is estimated <br /> as fol 1 ov~s: <br /> <br /> Avai 1 able <br /> Capacity <br /> <br /> North Pleasanton 64 signal s <br /> Remainder of Pleasanton 32 signal s <br /> Dublin 32 signals <br /> <br /> TOTAL 128 signal s <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.