My WebLink
|
Help
|
About
|
Sign Out
20
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
081908
>
20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 2:55:02 PM
Creation date
8/14/2008 2:55:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
20
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />On February 19, 2008 Pleasanton's City Council awarded the contract for the <br />referenced project to JJR Construction, Inc. in the amount of $167,827.00. The City <br />Council also authorized the Director of Public Works to approve change orders up to the <br />contingency amount of $33,565. The subject project has since been completed and is <br />ready for acceptance. <br />As part of the City's annual sidewalk and access ramp installations for the year 2007- <br />08, locations were selected along Holland Drive, Singletree Way, Hopyard Road, Valley <br />Avenue, Highland Oaks Drive and Woodthrush Road (See Attachment 1). The bids <br />received for the project were low compared to previous years; hence, an additional 10 <br />ramps were added to the project along West Las Positas Boulevard. <br />DISCUSSION <br />A summary of the project's funding sources and expenditures is presented in <br />Attachment 2. During construction a request was received from residents to add <br />additional ramps. Since the current pricing of $2,600 per ramp was significantly less <br />than the previous year's pricing ($500-$1,000 cheaper), staff decided to add ten <br />additional ramps to the project. At the time, it was anticipated that the work could be <br />performed within the existing contingency. However, during the latter stages of <br />completion, additional expenses related to landscaping were incurred. Some of the <br />ramps cut through existing landscaping, and after trimming back shrubs and other <br />landscaping, the residents felt the remaining plants and shrubs were unsightly. In an <br />effort to work with the adjacent homeowners, staff proceeded to replace the most <br />severely impacted landscaping. Adding the ten additional ramps along with replacing <br />landscaping towards the end of the project resulted in exceeding the project <br />contingency amount by $12,150. Staff recommends using funds already existing in the <br />project budget for CIP No. 075005 (but not yet approved for this contract), to cover the <br />additional expense of the change order that is beyond the originally approved <br />contingency amount. <br />Submitted by: Fiscal Review: Approved y: <br />Rob Wilson David P. Culver Nelson Fialho <br />Public Works Director Director of Finance City Manager <br />Attachments: <br />1. List of Project Locations <br />2. Funding and Expenditure Summary <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.