My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
081908
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2008 3:26:05 PM
Creation date
8/13/2008 3:26:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />This was the first of two (2) proposed construction phases that will ultimately result in <br />the renovation of the landscape plantings and irrigation system for all 20 separate <br />roadway median islands on West Las Positas Boulevard, from Santa Rita Road to <br />Boardwalk Street. This first phase renovated the eight (8) landscaped median islands <br />from Santa Rita Road to Rockingham Drive. These median islands had declined in <br />appearance over the past several years, and were at a point where the irrigation <br />systems and plantings required complete replacement. <br />On December 4, 2007, the City Council awarded a construction contract to the firm of <br />Planned Environments, Inc. of Concord, for the low bid of $213,369. Construction work <br />began in late February, 2008, and was completed satisfactorily and on-time. A 90-day <br />maintenance/plant establishment period followed construction, and that maintenance <br />period is now complete. <br />Submitted by: <br />~~ <br />es W. Wolfe <br />Director of Parks and <br />Community Services <br />Fiscal Review: <br />David P. Culver <br />Director of Finance <br />Approve by: <br />Nelson Fialho <br />City Manager <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.