My WebLink
|
Help
|
About
|
Sign Out
RES 85080
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2012 1:13:45 PM
Creation date
12/22/1999 10:50:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/12/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br /> <br /> SCOPE OF WORK <br /> DESIGN OF HOPYARD ROAD/I-580 INTERCHANGE MODIFICATIONS <br /> STAGE 2 IMPROVEMENTS <br /> CITY OF PLEASANTON <br /> <br />Task 1. Prepare Preliminary _~eSign and Estimate <br /> <br />This duty is the pre-requisite step to initiation of the design process. There <br />must be agreement among all interested agencies and approval by the City and <br />Caltrans (owners) of the final geometrics before detailed design can commence. <br />Any refinement of roadway geometrics would be accomplished during this phase. <br /> <br /> A. Preliminary Design 1. Review site <br /> 2. Review preliminary Caltrans geometrics <br /> 3. Prepare estimates for preliminary design <br /> 4. Circulate geometrics to City, State <br /> 5. Revise geometrics <br /> 6. Obtain City & Caltrans approval of final geometrics <br /> <br />Task 2. P.er.f.Orm Fi.eld Surv..ey.s <br /> <br /> 1. Review site w/Caltrans, Obtain survey permit <br /> 2. Perform supplementary surveys and mapping <br /> 3. Obtain copies of as-built plans <br /> <br />Task 3. Determine U_ti_lity Relocation Needs - <br /> <br />The preliminary tasks of this work may be accomplished during the preliminary <br />design period. The work includes "verifying existing utilities" and "searching <br />out applicable utility relocation agreements." <br /> <br />This contract does not include reimbursement costs to utility companies for <br />preparation of utility relocation plans. It is believed that eligible costs <br />may be reimburseable under appropriate City or State Master Utility agreements. <br />Therefore, the purpose of this task is to ascertain the rights of the various <br />parties so that this work may proceed. <br /> <br />When approved, copies of the final geometrics will be furnished the concerned <br />utility companies. As necessary, field reviews will be made with utility <br />company representatives. Where necessary, utility relocation plans will be <br />transferred to the geometrics base map. Utility clearance plans will be <br />transmitted to the owners for review and approval. <br /> <br />The final step is preparing necessary utility agreements between the owners and <br />the utility companies. In the usual case, standard forms are used; however, <br />the needs of each relocation must be described and costs assigned in accordance <br />with the master agreements. <br /> <br /> 1. Verify existing utilities <br /> 2. Determine applicable utility relocation agreements <br /> 3. Furnish approved geometrics to utility companies <br /> <br /> -1- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.